Case study:Robledo de Chavela dam removal: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=40.505008, -4.234515900000019 }} {{Project overview |Project title=Robledo de Chavela dam removal |Status=Co...") |
No edit summary |
||
(9 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Social benefits, Water quality, Urban | |Themes=Social benefits, Water quality, Urban | ||
|Country=Spain | |Country=Spain | ||
|Main contact forename= | |Main contact forename=Rincón Sanz | ||
|Main contact surname= | |Main contact surname=Gonzalo | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Dam removal.png | |||
|Picture description=Moment of the demolition of Robledo de Chavela dam. The first photo shows the dam before its removal. The second picture shows the demolition moment and the third the state of the dam after demolition. Photo Credits: Ministry of Agriculture and Fishing, Food and Environment (MAPAMA). | |||
|Project summary=The removal of the Robledo dam was a milestone as to be the highest dam demolished | |||
in Spain, and possibly, in Europe. | |||
The work carried out, besides the removal of the dam wall, consisted of the extraction | |||
and relocation of sediments, the capture and transfer of 4500 specimens of native fish, | |||
delimitation of the channel with riprap, slope profiling and reforestation of the | |||
riverbank. | |||
The dam was demolished on September 29, 2014, by the use of 1.2 tons of explosives. | |||
More than 9,000 m3 of concrete from the wall of the dam were demolished. | |||
|Monitoring surveys and results=Due to the problems of sediment contamination stored upstream of the dam, a study | |||
was carried out prior to the removal in order to make a diagnosis of the sediments and | |||
their treatment. A plan is implemented to remove some of these sediments and place | |||
them in higher areas where they were confined and stabilized by planting native | |||
vegetation. | |||
Two years after the removal of the dam, a monitoring plan was conducted to measure: | |||
- Physicochemical parameters of water as temperature, dissolved oxygen, | |||
conductivity and pH. | |||
- Habitat availability. | |||
- Quality of the riparian forest. | |||
- Flora (macrophytes) and fauna (macroinvertebrates and fish) present in the | |||
river, as well as exotic species. | |||
The fish community in the Cofio River near the Robledo dam is: Rainbow trout | |||
(Oncorhynchus mykiss), Iberian barbel (Luciobarbus bocagei), chub (Squalius | |||
pyrenaicus), calandino (Squalius alburnoides) and Iberian gudgeon (Gobio lozanoi), | |||
being Squalius alburnoides the dominant specie. All are native species of the Tajo River | |||
Basin except from the rainbow trout that is exotic and comes from sport fishing. | |||
Sampling points were determined both upstream and downstream from where the | |||
dam was located. The main results of this monitoring show clear signs of recovery in | |||
the river reach affected by the presence of the dam, with some differences between | |||
the areas that were located upstream and downstream of the dam. | |||
|Lessons learn=The removal of the Robledo dam stands out as an example of participatory | |||
management, in which the importance of administrative coordination between | |||
different social agents is evidenced. | |||
The Robledo dam removal will promote the recovery of altered river processes as a | |||
consequence of the construction, exploitation and abandonment of the dam. It will | |||
therefore contribute to the improvement of the ecological status of the Cofio River | |||
and the native fish populations in this river. | |||
A monitoring program was | |||
carried out after the dam | |||
removal (in August 2016) | |||
showing environmental | |||
improvements in the river | |||
after the removal. The | |||
importance of performing | |||
this monitoring before | |||
and after the dam | |||
removal is emphasized in | |||
order to quantify the | |||
effects that this type of | |||
actions have on the river. | |||
|Project title=Robledo de Chavela dam removal | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 19: | Line 81: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Heavily modified water body=No | ||
{{Motivations}} | |Protected species present=No | ||
{{Measures}} | |Invasive species present=No | ||
|Mean discharge category=0.1 - 1.0 m³/s | |||
|Mn discharge=0.75 | |||
}} | |||
{{Project background | |||
|Project started=2014/09/29 | |||
|Project completed=2014/09/29 | |||
|Total cost category=100 - 500 k€ | |||
|Total1 cost=280 | |||
|Supplementary funding information=There is a total budget of €1.5 million which includes the elimination of | |||
the dam and the renaturalization of the environment. | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Barriers to fish migration, | |||
|Hydromorphological quality elements=Continuity for organisms, Continuity of sediment transport, Quantity & dynamics of flow, | |||
|Biological quality elements=Fish: Abundance, Fish: Species composition, | |||
|Other motivation=Heavy metal pollution & This dam has never fulfilled the purpose for which it was designed, So the only management option, for technical, safety and environmental reasons, was its removal. | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Dam removal, extraction and relocation of sediments, Delimitation of the channel with riprap, slope profiling, Reforestation of the riverbank | |||
|Management interventions=Capture and transfer of fish | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 36: | Line 119: | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=europe.wetlands.org/publications/river-fragmentation-analysis-spain/ | |||
|Description=A link on the Wetlands International website to a document that describes the project. | |||
}} | |||
{{Additional links and references | |||
|Link=www.ecohidraulica.com/ | |||
|Description=All information on this page is copied from the document mentioned above which is written by Ecohidráulica, S.L. | |||
}} | |||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information | ||
|Information=References | |||
Amor Cortés, J. (2016). Emisiones de gases de efecto invernadero en la demolición de | |||
la presa de Robledo de Chavela y la restauración ambiental de los terrenos afectados. | |||
Final Master Degree dissertation. | |||
Confederación Hidrográfica del Tajo (2009). Diagnóstico y Propuesta de Tratamiento | |||
de los Sedimentos del Embalse de Robledo de Chavela en el río Cofio (Madrid). | |||
Estrategia Nacional de Restauración de Ríos. | |||
Confederación Hidrográfica del Tajo (2014). Derribada la presa de Robledo de Chavela | |||
(Madrid), sobre el río Cofio, la más alta desmantelada en España con casi 23 metros de | |||
altura. Press release from 29/09/2014 | |||
Confederación Hidrográfica del Tajo (2016). Seguimiento del estado ecológico del Río | |||
Cofio tras la demolición de la presa de Robledo de Chavela. | |||
Headwaters Economics (2016). Dam removal: case studies on the Fiscal, Economic, | |||
Social and Environmental benefits of dam removal. | |||
Industrial Economics Inc. (2015). Economic & Community Benefits from Stream Barrier | |||
Removal Projects in Massachusetts (MA). Massachusetts Department of Fish and | |||
Game, Division of Ecological Restoration. | |||
Ollero Ojeda, A. (2015). Guía metodológica sobre buenas prácticas en restauración | |||
fluvial. Manual para gestores. | |||
}} | |||
{{Toggle content end}} | {{Toggle content end}} |
Latest revision as of 13:48, 14 November 2018
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Social benefits, Water quality, Urban |
Country | Spain |
Main contact forename | Rincón Sanz |
Main contact surname | Gonzalo |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The removal of the Robledo dam was a milestone as to be the highest dam demolished
in Spain, and possibly, in Europe.
The work carried out, besides the removal of the dam wall, consisted of the extraction and relocation of sediments, the capture and transfer of 4500 specimens of native fish, delimitation of the channel with riprap, slope profiling and reforestation of the riverbank.
The dam was demolished on September 29, 2014, by the use of 1.2 tons of explosives. More than 9,000 m3 of concrete from the wall of the dam were demolished.
Monitoring surveys and results
Due to the problems of sediment contamination stored upstream of the dam, a study
was carried out prior to the removal in order to make a diagnosis of the sediments and
their treatment. A plan is implemented to remove some of these sediments and place
them in higher areas where they were confined and stabilized by planting native
vegetation.
Two years after the removal of the dam, a monitoring plan was conducted to measure:
- Physicochemical parameters of water as temperature, dissolved oxygen,
conductivity and pH.
- Habitat availability.
- Quality of the riparian forest.
- Flora (macrophytes) and fauna (macroinvertebrates and fish) present in the river, as well as exotic species.
The fish community in the Cofio River near the Robledo dam is: Rainbow trout (Oncorhynchus mykiss), Iberian barbel (Luciobarbus bocagei), chub (Squalius pyrenaicus), calandino (Squalius alburnoides) and Iberian gudgeon (Gobio lozanoi), being Squalius alburnoides the dominant specie. All are native species of the Tajo River Basin except from the rainbow trout that is exotic and comes from sport fishing.
Sampling points were determined both upstream and downstream from where the dam was located. The main results of this monitoring show clear signs of recovery in the river reach affected by the presence of the dam, with some differences between the areas that were located upstream and downstream of the dam.
Lessons learnt
The removal of the Robledo dam stands out as an example of participatory
management, in which the importance of administrative coordination between
different social agents is evidenced.
The Robledo dam removal will promote the recovery of altered river processes as a consequence of the construction, exploitation and abandonment of the dam. It will therefore contribute to the improvement of the ecological status of the Cofio River and the native fish populations in this river.
A monitoring program was carried out after the dam removal (in August 2016) showing environmental improvements in the river after the removal. The importance of performing this monitoring before and after the dam removal is emphasized in order to quantify the effects that this type of actions have on the river.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Supplementary funding informationThere is a total budget of €1.5 million which includes the elimination of the dam and the renaturalization of the environment.
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information References Amor Cortés, J. (2016). Emisiones de gases de efecto invernadero en la demolición de la presa de Robledo de Chavela y la restauración ambiental de los terrenos afectados. Final Master Degree dissertation. Confederación Hidrográfica del Tajo (2009). Diagnóstico y Propuesta de Tratamiento de los Sedimentos del Embalse de Robledo de Chavela en el río Cofio (Madrid). Estrategia Nacional de Restauración de Ríos. Confederación Hidrográfica del Tajo (2014). Derribada la presa de Robledo de Chavela (Madrid), sobre el río Cofio, la más alta desmantelada en España con casi 23 metros de altura. Press release from 29/09/2014 Confederación Hidrográfica del Tajo (2016). Seguimiento del estado ecológico del Río Cofio tras la demolición de la presa de Robledo de Chavela. Headwaters Economics (2016). Dam removal: case studies on the Fiscal, Economic, Social and Environmental benefits of dam removal. Industrial Economics Inc. (2015). Economic & Community Benefits from Stream Barrier Removal Projects in Massachusetts (MA). Massachusetts Department of Fish and Game, Division of Ecological Restoration. Ollero Ojeda, A. (2015). Guía metodológica sobre buenas prácticas en restauración fluvial. Manual para gestores.
|