Case study:South Esk restoration: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 83: Line 78:
        
        
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=2000 m
   
|Project started=2009/01/01
   
|Works completed=2011/01/01
      2000 m
|Funding sources=Scottish Environment Protection Agency,
|Project started=
      2009/01/01
|Works started=
     
|Works completed=
      2011/01/01
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
      SEPA
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 170: Line 99:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Removal of invasive species,Depth variation, Livestock fencing
   
|Planform / Channel pattern=Adding sinuosity,
   
|Management interventions=More sensitive channel maintenance
      Removal of invasive species,Depth variation,Introduction of livestock fencing
|Social measures=Awareness raising
|Floodplain / River corridor=
     
|Planform / Channel pattern=
      Introduction of sinuosity
|Other technical measure=
     
|Management interventions=
      More sensitive channel maintenance
|Social measures=
      Awareness raising
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 13:40, 1 November 2018

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 55° 55' 13.12" N, 3° 2' 41.39" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology, Land use management - forestry, Monitoring, Social benefits
Country Scotland
Main contact forename Susan
Main contact surname Arnott
Main contact user ID
Contact organisation SEPA
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Sout Esk
River basin South Esk

Subcatchment

River name South Esk
Area category 100 - 1000 km²
Area (km2) 564 km²56,400 ha <br />
Maximum altitude category 200 - 500 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Great Britain
Dominant land cover Grassland, Woodland
Waterbody ID



Other case studies in this subcatchment: Rottal Burn


Site

Name South Esk
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Single channel, Straight, Sinuous
Reference morphology Sinuous, Pool-riffle
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Protected Area
Local/regional site designations Ramsar
Protected species present
Invasive species present
Species of interest
Dominant hydrology Quick run-off
Dominant substrate Bedrock, Cobble, Gravel
River corridor land use Grassland, Woodland
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m)
Average bankfull channel depth category 2 - 5 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 2000 m2 km <br />200,000 cm <br />
Project started 2009/01/01
Works started
Works completed 2011/01/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Scottish Environment Protection Agency

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident, Invasive species
Hydromorphology Quantity & dynamics of flow, Channel pattern/planform
Biology
Physico-chemical Nutrient concentrations, Specific non-synthetic pollutants
Other reasons for the project Community demand, Habitat enhancement


Measures

Structural measures
Bank/bed modifications Removal of invasive species, Depth variation, Livestock fencing
Floodplain / River corridor
Planform / Channel pattern Adding sinuosity
Other
Non-structural measures
Management interventions More sensitive channel maintenance
Social measures (incl. engagement) Awareness raising
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Yes Yes Improvement
Quantity & dynamics of flow Yes Yes Yes Improvement

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Nutrient concentrations Yes Yes Yes Awaiting results
Specific non-synthetic pollutants Yes Yes Awaiting results

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information