Case study:Rheinauen bei Rastatt: Difference between revisions
Jump to navigation
Jump to search
JArmbruster (talk | contribs) No edit summary |
No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 17: | Line 17: | ||
|Multi-site=No | |Multi-site=No | ||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site | {{Site | ||
|Name=Rhine | |Name=River Rhine (and Murg, not displayed) | ||
|WFD (national) typology=Type 4 "gravel and stone embossed flow of the Alpine foothills", | |WFD water body code=3-OR4 (34-03-OR4) | ||
|WFD (national) typology=Type 4 "gravel and stone embossed flow of the Alpine foothills", | |||
|WFD water body name=Oberrhein | |WFD water body name=Oberrhein | ||
|Pre-project morphology=Low gradient passively meandering, | |Pre-project morphology=Low gradient passively meandering, | ||
Line 35: | Line 40: | ||
|Mean discharge category=more than 1000 m³/s | |Mean discharge category=more than 1000 m³/s | ||
|Mn discharge=1250 | |Mn discharge=1250 | ||
|Average channel gradient category=0.001 - 0.01 | |||
}} | }} | ||
{{Project background | {{Project background | ||
Line 40: | Line 46: | ||
|Project started=2011/01/01 | |Project started=2011/01/01 | ||
|Project completed=2015/12/31 | |Project completed=2015/12/31 | ||
|Funding sources=European Commission | |Funding sources=European Commission, State, Communities, NGOs, Associations, EU LIFE Programme, | ||
|Investigation and design Lead organisation=Regierungspraesidium Karlsruhe | |Investigation and design Lead organisation=Regierungspraesidium Karlsruhe | ||
|Stakeholder engagement Lead organisation=Regierungspraesidium Karlsruhe | |Stakeholder engagement Lead organisation=Regierungspraesidium Karlsruhe | ||
Line 51: | Line 57: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bank | |Bank and bed modifications measure=Bank improvement, island restoration | ||
|Floodplain / River corridor=reconnection of oxbow | |Floodplain / River corridor=reconnection of oxbow | ||
}} | }} | ||
Line 96: | Line 102: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=Rheinauen bei Rastatt Summary.pdf | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 13:24, 1 November 2018
Location: 48° 52' 50.29" N, 8° 8' 21.57" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | http://www.rheinauen-rastatt.de |
Themes | Habitat and biodiversity, Hydromorphology, Monitoring, Water quality |
Country | Germany |
Main contact forename | Daniel |
Main contact surname | Raddatz |
Main contact user ID | |
Contact organisation | Regierungspraesidium Karlsruhe |
Contact organisation web site | http://www.rp-karlsruhe.de |
Partner organisations | Stiftung Naturschutzfonds Baden-Württemberg |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|