|Project summary=Naarkoski torrent in the River Porvoonjoki is situated near the Pukkila city center. A fishway was constructed to enable the migrating fish to pass the Naarkoski power plant and open the way for fish to the upper reaches of the stream. Constructions of the bypass channel was started in October 2002 and finished in june 2003. Project was executed and managed in co-operation with the municipality of Pukkila and and Environmental Institute for Uusimaa. Cost of the restoration was 160 000 euros and it was financed by municipality of Pukkila, Environment Centre for Uusimaa and European Regional Development Fund, among the others.
|Project summary=Naarkoski torrent in the River Porvoonjoki is situated near the Pukkila city center. A fishway was constructed to enable the migrating fish to pass the Naarkoski power plant and open the way for fish to the upper reaches of the stream. Constructions of the bypass channel was started in October 2002 and finished in june 2003. Project was executed and managed in co-operation with the municipality of Pukkila and and Environmental Institute for Uusimaa. Cost of the restoration was 160 000 euros and it was financed by municipality of Pukkila, Environment Centre for Uusimaa and European Regional Development Fund, among the others.
}}
}}
{{Image gallery}}
{{Case study image
|File name=Restoration of Naarkoski Torrent  bypass.jpg
|Caption=Restoration of Naarkoski Torrent_bypass construction
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 79: Line 82:
        
        
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Project started=2002/01/01
   
|Works completed=2003/01/01
   
|Total cost category=100 - 500 k€
     
|Total1 cost=160 k€
|Project started=
|Funding sources=SYKE,European Regional Development Fund,Municipality of Pukkila,Regional ELY-centre,Uusimaa Regional Council
      2002/01/01
|Works started=
     
|Works completed=
      2003/01/01
|Project completed=
     
|Total cost category=
      100 - 500 k€
|Total1 cost=
      160 k€
|Funding sources=
      SYKE,European Regional Development Fund (ERDF),Municipality of Pukkila,Regional ELY-centre,Uusimaa Regional Council
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 166: Line 104:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes,
   
   
      Building fishway,Introducing gravel,Building of submerged weirs and pits,Introducing stones
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 193: Line 116:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
{{Case study image
|File name=Restoration of Naarkoski Torrent  bypass.jpg
|Caption=Restoration of Naarkoski Torrent_bypass construction
}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 226: Line 143:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 12:36, 1 November 2018

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 38' 30.99" N, 25° 35' 17.96" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Finland
Main contact forename Kari
Main contact surname Rantakokko
Main contact user ID
Contact organisation SYKE
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:Restoration of Porvoonjoki River

This is a parent project
encompassing the following
projects
No
Naarkoski Torrent after restoration

Project summary

Edit project overview to modify the project summary.


Naarkoski torrent in the River Porvoonjoki is situated near the Pukkila city center. A fishway was constructed to enable the migrating fish to pass the Naarkoski power plant and open the way for fish to the upper reaches of the stream. Constructions of the bypass channel was started in October 2002 and finished in june 2003. Project was executed and managed in co-operation with the municipality of Pukkila and and Environmental Institute for Uusimaa. Cost of the restoration was 160 000 euros and it was financed by municipality of Pukkila, Environment Centre for Uusimaa and European Regional Development Fund, among the others.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Restoration of Naarkoski Torrent_bypass construction
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Porvoonjoki River Basin
River basin

Subcatchment

River name Naarkoski Torrent
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Fenno-Scandian Shield
Dominant land cover Intensive agriculture (arable)
Waterbody ID



Site

Name Naarkoski Torrent-fishway
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Ponded
Reference morphology Step-pool
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral
Dominant substrate
River corridor land use Intensive agriculture (arable)
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2002/01/01
Works started
Works completed 2003/01/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 160 k€160,000 € <br />
Benefit to cost ratio
Funding sources SYKE, European Regional Development Fund, Municipality of Pukkila, Regional ELY-centre, Uusimaa Regional Council

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information