Case study:Irpin river restoration: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(21 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
|Location=50.076653106038, 29.548450469447
|Location=50.076653106038, 29.548450469447
|Kml file=Irpinsubbasin-water.kml
|Kml file=Irpinbasinsub.kml
}}
}}
{{Project overview
{{Project overview
Line 20: Line 20:
|Project summary=The full name of the project is: ''Integrated Planning of water resources use within the Irpin River basin'', subtitle: Irpin River restoration via integrated river basin management - Balancing nature, agriculture and recreation. The project was presented on the RR conference in Vienna 2013.
|Project summary=The full name of the project is: ''Integrated Planning of water resources use within the Irpin River basin'', subtitle: Irpin River restoration via integrated river basin management - Balancing nature, agriculture and recreation. The project was presented on the RR conference in Vienna 2013.


The project idea was developed on the basis of results from a comprehensive technical/hydrological study of the whole river basin in the years 2009-2012. In 2013 the Ukrainian Centre for River Restoration (UCRR) was established at the Institute for Water Problems and Land Reclamation, Kiev. The Irpin river project was selected as a first official project of the UCRR.
*'''Zome map out to 10km to see the outline of the exent of the project.'''
 
The project idea was developed on the basis of results from a comprehensive technical/hydrological study of the whole river basin in the years 2009-2012. In 2013 the Ukrainian Centre for River Restoration (UCRR) was established at the Institute of Water Problems and Land Reclamation, Kiev. The Irpin river project was selected as a first official project of the UCRR.




The project implementation has started with the participation and consultation of stakeholders in a special workshop in April 2014. Before, during and after this workshop all kind of information has been collected and used to set up a database for the use of GIS visualisation, GIS-based modelling and first characterisation of the catchments.
The project implementation has started with the participation and consultation of stakeholders in a special workshop in April 2014. Before, during and after this workshop all kind of information has been collected and used to set up a database for the use of GIS visualisation, GIS-based modelling and first characterisation of the catchments.
|Monitoring surveys and results=A regular monitoring as foreseen for the WFD was not yet implemented. Existing results of former studies are mainly related to river discharge and random samplings of water quality controls.
|Monitoring surveys and results=A regular monitoring as foreseen for the WFD was not yet implemented. Existing results of former studies are mainly related to river discharge and random samplings for water quality controls. Further monitoring results are collected by several departments of the Ministry of Ecology and Natural Resources of Ukraine. The sampling stations are however further downriver of the subbasin border.
|Lessons learn=The big number of problems and open questions is beyond the personnel and financial capacity of Ukrainian state institutions. International cooperation will help to gain or exchange best practices in river restoration but it is also clear that a much smaller subbasin of the river had to be selected to start with.
|Lessons learn=The big number of problems and open questions is beyond the personnel and financial capacity of Ukrainian state institutions. International cooperation will help to gain or exchange best practices in river restoration but it is also clear that a much smaller subbasin of the river had to be selected to start with.
}}
}}
Line 30: Line 32:
{{Case study image
{{Case study image
|File name=Bankburned.jpg
|File name=Bankburned.jpg
|Caption=Landuse pressures will be identified and solutions proposed
|Caption=Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn)
}}
}}
{{Case study image
{{Case study image
|File name=Irpen-sluise.jpg
|File name=Irpen-sluise.jpg
|Caption=One of 17 massive concrete constructions built to regulate water flow and to avoid flooding downstream (photo Vasiliy Kostyushin)
|Caption=One of 17 massive concrete constructions built to regulate water flow and to avoid flooding downstream (photo Vasiliy Kostiushyn)
}}
{{Case study image
|File name=Residents.jpg
|Caption=Private buildings in the river valley (photo Vasiliy Kostiushyn)
}}
{{Case study image
|File name=Landuseag.jpg
|Caption=Agriculture is the main landuse in the subbasin
}}
{{Case study image
|File name=Nitratepaths.png
|Caption=Canalisation is still missing. Groundwater pollution from living places is assessed by GIS-based modelling.
}}
}}
{{Image gallery end}}
{{Image gallery end}}
Line 40: Line 54:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site
{{Project background}}
|Name=Irpin River subbasin
|WFD water body code=UA0112/xx
|WFD (national) typology=HMWB, Type 15: small sand-dominated lowland river,
|Pre-project morphology=low land river of the Eastern Plains, impounded,
|Reference morphology=Actively meandering,
|Desired post project morphology=improved connectivity
|Heavily modified water body=Yes
|Protected species present=Yes
|Invasive species present=Yes
|Dominant hydrology=Artificially regulated,
|Dominant substrate=Sand,
|River corridor land use=Intensive agriculture (arable), forestry, pastures, settlements
|Mean discharge category=1 - 10 m³/s
|Average channel gradient category=0.001 - 0.01
}}
{{Project background
|Reach length directly affected=10000
|Project started=2013/04/01
|Works started=2013/04/01
|Stakeholder1 engagement cost category=Less than 1 k€
|Supplementary funding information=The project is still in the planning phase; funds not yet available
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=The r. Irpin must be considered as heavily modified (HMWB) due to dam constructions, intensive agriculture a.o.
|Hydromorphological quality elements=Channel pattern/planform, The River Irpin must be considered as heavily modified (HMWB) due to dam constructions, intensive agriculture a.o.
|Physico-chemical quality elements=water quality influenced by diffuse pollution sources (agriculture, urbanisation)
|Physico-chemical quality elements=Nutrient concentrations,  water quality influenced by diffuse pollution sources (agriculture, urbanisation)
|Other motivation=Community demand, recreation, landscape enhancement  
|Other motivation=Community demand, recreation, landscape enhancement
}}
}}
{{Measures
{{Measures
|Other technical measure=dismantling of weirs or dams that are not needed anymore
|Bank and bed modifications measure=Weir removal, Dam removal,
|Management interventions=landuse changes
|Management interventions=landuse changes
|Wider stakeholder / citizen engagement=cooperation with local or regional investors
|Wider stakeholder / citizen engagement=cooperation with local or regional investors
Line 65: Line 100:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=www.researchgate.net/publication/321192989_HYDROMORPHOLOGICAL_ASSESSMENTS_AT_THE_IRPIN_RIVER-METHODOLOGICAL_HINTS_AND_FIRST_FINDINGS
|Description=1st habitat assessment of a reach of the R. Irpin
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 14:18, 29 November 2017

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 4' 35.95" N, 29° 32' 54.42" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Economic aspects, Flood risk management, Hydromorphology, Land use management - agriculture, Social benefits, Spatial planning
Country Ukraine
Main contact forename Michael
Main contact surname Hoffmann
Main contact user ID User:Miho-kiev
Contact organisation Institute of Water Problems and Land Reclamation
Contact organisation web site http://igim.org.ua
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The Irpin River, right tributary of the Dnieper River west of Kiev, Ukraine (photo Vasiliy Kostyushin)

Project summary

Edit project overview to modify the project summary.


The full name of the project is: Integrated Planning of water resources use within the Irpin River basin, subtitle: Irpin River restoration via integrated river basin management - Balancing nature, agriculture and recreation. The project was presented on the RR conference in Vienna 2013.

  • Zome map out to 10km to see the outline of the exent of the project.

The project idea was developed on the basis of results from a comprehensive technical/hydrological study of the whole river basin in the years 2009-2012. In 2013 the Ukrainian Centre for River Restoration (UCRR) was established at the Institute of Water Problems and Land Reclamation, Kiev. The Irpin river project was selected as a first official project of the UCRR.


The project implementation has started with the participation and consultation of stakeholders in a special workshop in April 2014. Before, during and after this workshop all kind of information has been collected and used to set up a database for the use of GIS visualisation, GIS-based modelling and first characterisation of the catchments.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


A regular monitoring as foreseen for the WFD was not yet implemented. Existing results of former studies are mainly related to river discharge and random samplings for water quality controls. Further monitoring results are collected by several departments of the Ministry of Ecology and Natural Resources of Ukraine. The sampling stations are however further downriver of the subbasin border.

Lessons learnt

Edit project overview to modify the lessons learnt.


The big number of problems and open questions is beyond the personnel and financial capacity of Ukrainian state institutions. International cooperation will help to gain or exchange best practices in river restoration but it is also clear that a much smaller subbasin of the river had to be selected to start with.


Image gallery


Landuse pressures will be identified and solutions proposed (photo Vasiliy Kostiushyn)
One of 17 massive concrete constructions built to regulate water flow and to avoid flooding downstream (photo Vasiliy Kostiushyn)
Private buildings in the river valley (photo Vasiliy Kostiushyn)
Agriculture is the main landuse in the subbasin
Canalisation is still missing. Groundwater pollution from living places is assessed by GIS-based modelling.
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Irpin River subbasin
WFD water body codes UA0112/xx
WFD (national) typology HMWB, Type 15: small sand-dominated lowland river
WFD water body name
Pre-project morphology low land river of the Eastern Plains, impounded
Reference morphology Actively meandering
Desired post project morphology improved connectivity
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate Sand
River corridor land use Intensive agriculture (arable), forestry, pastures, settlements
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category 1 - 10 m³/s
Mean annual discharge (m3/s)
Average channel gradient category 0.001 - 0.01
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 1000010,000 m <br />10 km <br />1,000,000 cm <br />
Project started 2013/04/01
Works started 2013/04/01
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication Less than 1 k€
Works and works supervision
Post-project management and maintenance
Monitoring

Supplementary funding information

The project is still in the planning phase; funds not yet available



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, The River Irpin must be considered as heavily modified (HMWB) due to dam constructions, intensive agriculture a.o.
Biology
Physico-chemical Nutrient concentrations, water quality influenced by diffuse pollution sources (agriculture, urbanisation)
Other reasons for the project Community demand, recreation, landscape enhancement


Measures

Structural measures
Bank/bed modifications Weir removal, Dam removal
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions landuse changes
Social measures (incl. engagement)
Other cooperation with local or regional investors


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.researchgate.net/publication/321192989 HYDROMORPHOLOGICAL ASSESSMENTS AT THE IRPIN RIVER-METHODOLOGICAL HINTS AND FIRST FINDINGS 1st habitat assessment of a reach of the R. Irpin

Supplementary Information

Edit Supplementary Information