Case study:Tall River: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=54.43942584833165, -6.587434513494372 }} {{Project overview |Project title=Tall River |Status=Complete |Them...") |
No edit summary |
||
(20 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Fisheries, Flood risk management, Habitat and biodiversity | |Themes=Fisheries, Flood risk management, Habitat and biodiversity | ||
|Country= | |Country=Northern Ireland | ||
|Main contact forename=Judith | |Main contact forename=Judith | ||
|Main contact surname=Bankhead | |Main contact surname=Bankhead | ||
|Contact organisation=Rivers Agency | |Contact organisation=Rivers Agency Northern Ireland (DARDNI) | ||
|Contact organisation url=www.dardni.gov.uk/index/rivers.htm | |Contact organisation url=www.dardni.gov.uk/index/rivers.htm | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Bay 2 2006.JPG | |||
|Picture description=Bay 2 and stone cascade - 2006 | |||
|Project summary=The Tall River is a main tributary of the River Blackwater, flowing through Co. Armagh. It is a slow flowing, low energy river within an agricultural catchment. The river had been subject to an arterial drainage scheme in the 1960s, which deepened and widened the river as well as disconnecting it from its floodplain. The 1.2km Tall River scheme was the first project within Northern Ireland to address the specific need to enhance the riverine environment, rather than being attached to a larger flood prevention scheme. Works could only be carried out in-channel and on the National Trust owned right bank due to landowner restrictions. | |||
The aim of the protect was to create shallow slack-water habitat through the creation of bays. These would provide shelter for fish fry and invertebrates during high flows and aimed to increase macrophyte diversity within the reach. Stone cascades were also installed to direct flow away from potentially erodable banks. | |||
A repeat RCS carried out two years post works indicated an increase in emergent vegetation and macrophyte diversity. The bays are inundated at high flows, acting as a fish refuge, however due to siltation these may be becoming too shallow. Following the creation of stone cascades greater flow variation has been ovserved. The success of the bays appears to depend on the presence, or otherwise, of a structure deflecting water into them. | |||
If the project was to be carried out again more consideration should be given to the location of the bays within the overall flow regime or alternatively structures that would maintain flows into the bay should be included in the design. | |||
Plus, part of a wider scheme developing footpath access along the river. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Aerial 1998.jpg | |||
|Caption=Downstream bays after two years - 1998 | |||
}} | |||
{{Case study image | |||
|File name=Bay 2 down stream 8 01.jpg | |||
|Caption=Bay 2, heavily vegetated - 2012 | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Name=Tall River | ||
{{Motivations}} | |WFD water body code=10611 | ||
{{Measures}} | |Pre-project morphology=Over deepened, Over-widened channel as a result of arterial drainage | ||
|Reference morphology=Narrower, Sinuous channel with shallow margins | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Dominant substrate=Clay | |||
|River corridor land use=Agriculture (arable) | |||
}} | |||
{{Project background | |||
|Reach length directly affected=1200 | |||
|Project started=1995/07/01 | |||
|Project completed=1996/12/01 | |||
|Supplementary funding information=Information about cost of scheme not available | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Habitat creation, fisheries, floodplain reconnection | |||
|Hydromorphological quality elements=Flow dynamics | |||
|Biological quality elements=Fish, Invertebrates, Macrophytes, | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Creation of four bays on right hand bank | |||
|Floodplain / River corridor=Connection to wider floodplain, | |||
|Planform / Channel pattern=Creation of backwater, | |||
|Social measures=Improved public access, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
{{Biological quality elements header}} | {{Biological quality elements header}} | ||
{{Biological quality element table row | |||
|Element=Macrophytes | |||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=Yes | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=Improvement | |||
}} | |||
{{Biological quality element table row | |||
|Element=Fish | |||
|Monitored before=No | |||
|Monitored after=Yes | |||
|Qualitative monitoring=No | |||
|Quantitative monitoring=Yes | |||
|Control site used=No | |||
|Result=Improvement | |||
}} | |||
{{End table}} | {{End table}} | ||
{{Physico-chemical quality elements header}} | {{Physico-chemical quality elements header}} | ||
Line 31: | Line 93: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.therrc.co.uk/mot/Tall_3.8_25Apr2013_Av.pdf | |||
|Description=RRC Manual of River Restoration Techniques entry | |||
}} | |||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 12:13, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Flood risk management, Habitat and biodiversity |
Country | Northern Ireland |
Main contact forename | Judith |
Main contact surname | Bankhead |
Main contact user ID | |
Contact organisation | Rivers Agency Northern Ireland (DARDNI) |
Contact organisation web site | http://www.dardni.gov.uk/index/rivers.htm |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Tall River is a main tributary of the River Blackwater, flowing through Co. Armagh. It is a slow flowing, low energy river within an agricultural catchment. The river had been subject to an arterial drainage scheme in the 1960s, which deepened and widened the river as well as disconnecting it from its floodplain. The 1.2km Tall River scheme was the first project within Northern Ireland to address the specific need to enhance the riverine environment, rather than being attached to a larger flood prevention scheme. Works could only be carried out in-channel and on the National Trust owned right bank due to landowner restrictions.
The aim of the protect was to create shallow slack-water habitat through the creation of bays. These would provide shelter for fish fry and invertebrates during high flows and aimed to increase macrophyte diversity within the reach. Stone cascades were also installed to direct flow away from potentially erodable banks.
A repeat RCS carried out two years post works indicated an increase in emergent vegetation and macrophyte diversity. The bays are inundated at high flows, acting as a fish refuge, however due to siltation these may be becoming too shallow. Following the creation of stone cascades greater flow variation has been ovserved. The success of the bays appears to depend on the presence, or otherwise, of a structure deflecting water into them.
If the project was to be carried out again more consideration should be given to the location of the bays within the overall flow regime or alternatively structures that would maintain flows into the bay should be included in the design.
Plus, part of a wider scheme developing footpath access along the river.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Supplementary funding informationInformation about cost of scheme not available
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|