Case study:Vindel River LIFE: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(23 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=64.9488313, 18.0943494
|Location=65.11579443969795, 18.282623291015625
}}
{{Project overview
|Status=In progress
|Project web site url=vindelriverlife.se/
|Themes=Fisheries, Habitat and biodiversity, Hydromorphology, Water quality
|Country=Sweden
|Main contact forename=Johanna
|Main contact surname=Gardeström
|Main contact id=Arolam
|Contact organisation=Umeå University
|Contact organisation url=www.umu.se
|Partner organisations=Swedish University of Agricultural Sciences and Ume/ Vindel river Fishery Advisory Board
|Name of parent multi-site project=Case_study:Vindel River LIFE
|Multi-site=No
|Project picture=Olsbacken Jonsson.PNG
|Picture description=Olsbacken after restoration (photo by Daniel Jonsson)
|Project summary=Vindel River LIFE is collaborative project between Umeå University, Vindel River Fishery Advisory Board, and the Swedish University of Agricultural Sciences. Tributaries that were affected by fragmentation and channelization during the timber-floating era will be restored with the objective to widen the floodplain, increase the variation in the stream habitats, and to improve the condition for species in the Vindel river system. The Vindel river provides a unique habitat for a variety of aquatic species and many of them are listed as protected species. Otter, great diving beetle, bullhead, Atlantic Salmon, Salmon Trutta and freshwater pearl mussel are all present in the stream.
The length of the restored area is 4500 meters. During the restoration banks have been modified, closed channels re-opened, spawning grounds constructed and building fishways have been taken away to improve the habitats for migratory fish.
 
Ten demonstration sites were restored in 2010. By monitoring these restored sites and their references, the effects of restoration will be evaluated: hydrological measurements were done before restoration and after restoration in 2011; fish abundance was monitored before restoration and the after measurements will be done in summer 2013 and 2014; the riparian vegetation will be monitored after restoration in summer 2013 and 2014.
 
Remediation of Migratory Barriers in streams (ReMiBar) -project is related to the Vindel River LIFE project. (http://www.trafikverket.se/PageFiles/91694/remibar_remediation_of_migratory_barriers_in_streams.pdf)
}}
{{Image gallery}}
{{Case study image
|File name=NVindel River Lifen Lidsbacken before restoration.jpg
|Caption=nVindel River Lifen Lidsbacken_before restoration
}}
}}
{{Project_overview
{{Case study image
|Status=
|File name=NVindel River Lifen Lidsbacken after restoration.jpg
   
|Caption=Vindel River Lifen Lidsbacken_after restoration
   
      Complete
|Project web site url=
     
|Themes=
      Land use: Forestry
|Country=
      Sweden
|Main contact forename=
      Johanna
|Main contact surname=
      Gardeström
|Main contact id=
     
|Contact organisation=
      Umeå University
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
      Yes
|Name of parent multi-site project=
      Case_study:Vindel River LIFE
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 51: Line 47:
}}
}}
{{Site
{{Site
|Name=
|Pre-project morphology=Straight,High width:depth
   
|Reference morphology=Braided,Sinuous
   
|Heavily modified water body=No
     
|Site designation=EU - Special Area of Conservation
|WFD water body code=
|Protected species present=Yes
     
|Invasive species present=No
|WFD (national) typology=
|Species=otter (Lutra lutra), highland great diving beetle (Dytiscus lapponicus), bullhead (Cottus gobio), Atlantic salmon (Salmo salar), Brown trout (Salmo trutta), Freshwater pearl mussel (Margaritifera margaritifera),
     
|Dominant substrate=Gravel,Sand,Cobble
|WFD water body name=
|River corridor land use=Woodland
     
|Pre-project morphology=
      Straight,High width:depth
|Reference morphology=
      Braided,Sinuous
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
      EU - Special Area of Conservation
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
      Gravel,Sand,Cobble
|River corridor land use=
      Woodland
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=4500
   
|Project started=2010/01/01
   
|Works started=2011/01/01
     
|Works completed=2014/01/01
|Project started=
|Total cost category=more than 10000 k€
      2010/01/01
|Total1 cost=2 675 513
|Works started=
|Funding sources=European Commission, Federal Nature Protection Agency, County Administrative Board, Municipalities, Universities, Ume/Vindel River Fishery Advisory Board
      2011/01/01
|Investigation and design Lead organisation=Umeå University
|Works completed=
|Investigation and design Other contact forename=Johanna
      2014/01/01
|Investigation and design Other contact surname=Gardeström
|Project completed=
|Stakeholder engagement Lead organisation=Umeå University
     
|Stakeholder engagement Other contact forename=Johanna
|Total cost category=
|Stakeholder engagement Other contact surname=Gardeström
      100 - 500 k€
|Total1 cost=
     
|Funding sources=
      European Commission,Federal Nature Protection Agency,County Administrative Board,Municipalities,Universities
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
      Umeå University
|Investigation and design Other contact forename=
      Johanna
|Investigation and design Other contact surname=
      Gardeström
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
      Umeå University
|Stakeholder engagement Other contact forename=
      Johanna
|Stakeholder engagement Other contact surname=
      Gardeström
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 187: Line 87:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Re-introducing stones,Re-introducing gravel, Dam removal, Creation of fish passes, Introducing large woody debris,
   
|Floodplain / River corridor=Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure, Vegetation management,
   
|Planform / Channel pattern=Re-instatement of old course
      Re-introducing stones and large woody debris,Re-introducing stones and gravel,Removal of old dams,Building fishways
|Floodplain / River corridor=
      Increases the interaction between land and water and the heterogeneity of the substrate, vegetation and shore structure
|Planform / Channel pattern=
      Re-instatement of old course
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_element_table_row
|Element=
   
   
   
      Flow velocities
|Monitored before=
      Yes
|Monitored after=
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{Hydromorphological_quality_element_table_row
{{Hydromorphological quality elements header}}
|Element=
{{Hydromorphological quality element table row
   
|Element=Flow velocities
   
|Monitored before=Yes
      Continuity for organisms
|Monitored after=Yes
|Monitored before=
|Qualitative monitoring=No
     
|Quantitative monitoring=Yes
|Monitored after=
|Control site used=No
     
|Result=Awaiting results
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{Hydromorphological_quality_element_table_row
{{Hydromorphological quality element table row
|Element=
|Element=Width & depth variation
   
|Monitored before=Yes
   
|Monitored after=Yes
      Width & depth variation
|Qualitative monitoring=No
|Monitored before=
|Quantitative monitoring=Yes
     
|Control site used=No
|Monitored after=
|Result=Awaiting results
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{End_table}}
{{End_table}}
{{Biological_quality_elements_header}}
{{Biological quality elements header}}
{{Biological_quality_element_table_row
{{Biological quality element table row
|Element=
|Element=Fish: Disturbance-sensitive species
   
|Monitored before=Yes
   
|Monitored after=Yes
   
|Qualitative monitoring=No
   
|Quantitative monitoring=Yes
      Fish: Disturbance-sensitive species
|Control site used=No
|Monitored before=
|Result=Awaiting results
      Yes
|Monitored after=
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{Biological_quality_element_table_row
{{Biological quality element table row
|Element=
|Element=Fish: Abundance
   
|Monitored before=Yes
   
|Monitored after=No
      Fish: Abundance
|Qualitative monitoring=No
|Monitored before=
|Quantitative monitoring=Yes
     
|Control site used=No
|Monitored after=
|Result=Awaiting results
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{Biological_quality_element_table_row
{{Biological quality element table row
|Element=
|Element=Invertebrates: Disturbance-sensitive species
   
|Monitored before=No
   
|Monitored after=No
      Invertebrates: Disturbance-sensitive species
|Qualitative monitoring=No
|Monitored before=
|Quantitative monitoring=No
     
|Control site used=No
|Monitored after=
|Result=Awaiting results
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Awaiting results
}}
}}
{{End_table}}
{{End_table}}
Line 365: Line 187:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 373: Line 193:
{{Supplementary_Information
{{Supplementary_Information
|Information=
|Information=
   
 
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 09:28, 5 June 2017

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 65° 6' 56.86" N, 18° 16' 57.44" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://vindelriverlife.se/
Themes Fisheries, Habitat and biodiversity, Hydromorphology, Water quality
Country Sweden
Main contact forename Johanna
Main contact surname Gardeström
Main contact user ID User:Arolam
Contact organisation Umeå University
Contact organisation web site http://www.umu.se
Partner organisations Swedish University of Agricultural Sciences and Ume/ Vindel river Fishery Advisory Board
Parent multi-site project

Case_study:Vindel River LIFE

This is a parent project
encompassing the following
projects
No
Olsbacken after restoration (photo by Daniel Jonsson)

Project summary

Edit project overview to modify the project summary.


Vindel River LIFE is collaborative project between Umeå University, Vindel River Fishery Advisory Board, and the Swedish University of Agricultural Sciences. Tributaries that were affected by fragmentation and channelization during the timber-floating era will be restored with the objective to widen the floodplain, increase the variation in the stream habitats, and to improve the condition for species in the Vindel river system. The Vindel river provides a unique habitat for a variety of aquatic species and many of them are listed as protected species. Otter, great diving beetle, bullhead, Atlantic Salmon, Salmon Trutta and freshwater pearl mussel are all present in the stream. The length of the restored area is 4500 meters. During the restoration banks have been modified, closed channels re-opened, spawning grounds constructed and building fishways have been taken away to improve the habitats for migratory fish.

Ten demonstration sites were restored in 2010. By monitoring these restored sites and their references, the effects of restoration will be evaluated: hydrological measurements were done before restoration and after restoration in 2011; fish abundance was monitored before restoration and the after measurements will be done in summer 2013 and 2014; the riparian vegetation will be monitored after restoration in summer 2013 and 2014.

Remediation of Migratory Barriers in streams (ReMiBar) -project is related to the Vindel River LIFE project. (http://www.trafikverket.se/PageFiles/91694/remibar_remediation_of_migratory_barriers_in_streams.pdf)

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


nVindel River Lifen Lidsbacken_before restoration
Vindel River Lifen Lidsbacken_after restoration
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district
River basin Vindel River Basin

Subcatchment

River name River Vindelälven
Area category more than 10000 km²
Area (km2) 12650 km²1,265,000 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover Woodland
Waterbody ID



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Straight, High width:depth
Reference morphology Braided, Sinuous
Desired post project morphology
Heavily modified water body No
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present Yes
Invasive species present No
Species of interest otter (Lutra lutra), highland great diving beetle (Dytiscus lapponicus), bullhead (Cottus gobio), Atlantic salmon (Salmo salar), Brown trout (Salmo trutta), Freshwater pearl mussel (Margaritifera margaritifera)
Dominant hydrology
Dominant substrate Gravel, Sand, Cobble
River corridor land use Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 45004,500 m <br />4.5 km <br />450,000 cm <br />
Project started 2010/01/01
Works started 2011/01/01
Works completed 2014/01/01
Project completed
Total cost category more than 10000 k€
Total cost (k€) 2 675 5132,675,513 k€ <br />2,675,513,000 € <br />
Benefit to cost ratio
Funding sources European Commission, Federal Nature Protection Agency, County Administrative Board, Municipalities, Universities, Ume/Vindel River Fishery Advisory Board

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Umeå University Johanna Gardeström
Stakeholder engagement and communication Umeå University Johanna Gardeström
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development
Hydromorphology Width & depth variation, Flow velocities, Substrate conditions
Biology Fish: Disturbance-sensitive species, Invertebrates: Disturbance-sensitive species, Fish: Abundance, Continuity of sediment transport
Physico-chemical Invertebrates: Diversity
Other reasons for the project Landscape enhancement, Bank erosion, Flood risk management


Measures

Structural measures
Bank/bed modifications Re-introducing stones, Re-introducing gravel, Dam removal, Creation of fish passes, Introducing large woody debris
Floodplain / River corridor Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure, Vegetation management
Planform / Channel pattern Re-instatement of old course
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flow velocities Yes Yes No Yes No Awaiting results
Width & depth variation Yes Yes No Yes No Awaiting results


Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Disturbance-sensitive species Yes Yes No Yes No Awaiting results
Fish: Abundance Yes No No Yes No Awaiting results
Invertebrates: Disturbance-sensitive species No No No No No Awaiting results

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information