Case study:The Fortuna Restoration Project: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 120: | Line 120: | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Create breaches in the bank | |Bank and bed modifications measure=Create breaches in the bank | ||
|Planform / Channel pattern= | |Planform / Channel pattern=Reconnecting polder, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Latest revision as of 09:46, 2 June 2017
Location: 45° 11' 28.43" N, 29° 8' 53.17" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Romania |
Main contact forename | Marian |
Main contact surname | Tudor |
Main contact user ID | |
Contact organisation | The Danube Delta National Institute for Research and Development, Tulcea |
Contact organisation web site | http://www.ddni.ro |
Partner organisations | The Danube Delta Biosphere Reserve Authority |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The aim of the project was to connecting agricultural polder Fortuna (2,115 ha) to the Danube regime. Restoration of hydrological regime and hydrological functions means for this area, restoring and establishing the following functions:
- habitat for plants and animals typical alluvial areas;
- habitat and breeding area for fish and aquatic birds;
- reservoir for biodiversity and providing genetic resources;
- biocoridor and genetic exchange;
- organic production;
- biogeochemical circuit elements;
- retention of sediments and pollutions;
- Black Sea biofilter
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|