Case study:The Holbina-Dunavat Restoration Project: Difference between revisions
No edit summary |
No edit summary |
||
(9 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 17: | Line 17: | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Holbina.jpg | |Project picture=Holbina.jpg | ||
|Picture description=Holbina area (source: www.info-delta.ro) | |||
|Project summary=Holbina-Dunavat area (S=5630 ha) has been studied from 1994 in order to establish a strategy for ecological restoration by a reintegration of the fish farm basins with the surrounding wetlands by opening the ring dikes around the basins. The positive effects are both ecological (wetland restoration, natural habitat and breeding area for fish and aquatic birds) and socio-economical (development of traditional activities, fishing, livestock and reed harvesting, creation of recreational areas for ecotourism) for the local people. | |||
Works included: Connecting Fishpond Holbina-Dunavat to the Danube regime. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=The entrance in Holbina area.jpg | |||
|Caption=The entrance in Holbina area (source:www.info-delta.ro) | |||
}} | |||
{{Case study image | |||
|File name=Dunavat channel.jpg | |||
|Caption=Dunavat channel (source:www.info-delta.ro) | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 124: | Line 141: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Create breaches in the bank | ||
|Floodplain / River corridor=Creation of wetland | |||
|Floodplain / River corridor= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 392: | Line 395: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 408: | Line 401: | ||
}} | }} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.ddbra.ro | |||
|Description=The website of the Danube Delta Biosphere Reserve Authority | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 09:07, 2 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Romania |
Main contact forename | Marian |
Main contact surname | Tudor |
Main contact user ID | |
Contact organisation | The Danube Delta Biosphere Reserve Authority |
Contact organisation web site | http://www.ddbra.ro |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Holbina-Dunavat area (S=5630 ha) has been studied from 1994 in order to establish a strategy for ecological restoration by a reintegration of the fish farm basins with the surrounding wetlands by opening the ring dikes around the basins. The positive effects are both ecological (wetland restoration, natural habitat and breeding area for fish and aquatic birds) and socio-economical (development of traditional activities, fishing, livestock and reed harvesting, creation of recreational areas for ecotourism) for the local people.
Works included: Connecting Fishpond Holbina-Dunavat to the Danube regime.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1, Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2, Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|