Case study:Sågarsfors: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 20: | Line 15: | ||
|Contact organisation url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx | |Contact organisation url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=600px after Sagarsfors 26082010.jpg | |||
|Picture description=After restoration. Photo by Esa Lehtinen | |||
|Project summary=The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish. | |Project summary=The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Sagarsfors Before dam removal.JPG | |||
|Caption=Before dam removal (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors Before dam removal (2).JPG | |||
|Caption=Before dam removal (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors Dam removal.JPG | |||
|Caption=Work (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors After dam removal.JPG | |||
|Caption=After dam removal (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors After damremoval(2).JPG | |||
|Caption=After dam removal (Jukka Jormola) | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 65: | Line 87: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Building of submerged weirs and pits,Introduction of gravel, Creation of fish passes, | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 92: | Line 99: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 120: | Line 105: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 08:37, 2 June 2017
Location: 60° 12' 59.21" N, 24° 14' 42.69" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx |
Themes | Fisheries, Habitat and biodiversity |
Country | Finland |
Main contact forename | Esa |
Main contact surname | Lehtinen |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for Uusimaa |
Contact organisation web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|