Case study:Sågarsfors: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(18 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity | |Project web site url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx | ||
|Themes=Fisheries, Habitat and biodiversity | |||
|Country=Finland | |Country=Finland | ||
|Main contact forename= | |Main contact forename=Esa | ||
|Main contact surname= | |Main contact surname=Lehtinen | ||
|Contact organisation= | |Contact organisation=Centre for Economic Development, Transport and the Environment for Uusimaa | ||
|Contact organisation url=www. | |Contact organisation url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=600px after Sagarsfors 26082010.jpg | |||
|Picture description=After restoration. Photo by Esa Lehtinen | |||
|Project summary=The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Sagarsfors Before dam removal.JPG | |||
|Caption=Before dam removal (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors Before dam removal (2).JPG | |||
|Caption=Before dam removal (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors Dam removal.JPG | |||
|Caption=Work (Jukka Jormola) | |||
}} | |||
{{Case study image | |||
|File name=Sagarsfors After dam removal.JPG | |||
|Caption=After dam removal (Jukka Jormola) | |||
}} | }} | ||
{{Case study image | |||
|File name=Sagarsfors After damremoval(2).JPG | |||
|Caption=After dam removal (Jukka Jormola) | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 27: | Line 51: | ||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Sågarsfors dam | ||
|Pre-project morphology=Ponded | |||
|Reference morphology=Artificial channel | |||
|Heavily modified water body=No | |||
|Protected species present=Yes | |||
|Invasive species present=No | |||
|Species=Sea trout (Salmo trutta), freshwater pearl mussel (Margaritifera margaritifera) | |||
|Dominant hydrology=Artificially regulated | |||
|Mean discharge category=1 - 10 m³/s | |||
|Mn discharge=2,8 | |||
|Pre-project morphology= | |||
|Reference morphology= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
|Species= | |||
|Dominant hydrology= | |||
|Mean discharge category= | |||
|Mn discharge= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=500 | ||
|Project started=2006/01/01 | |||
|Works started=2007/09/02 | |||
|Project completed=2010/12/31 | |||
|Project started= | |Total cost category=50 - 100 k€ | ||
|Total1 cost=100 | |||
|Works started= | |Funding sources=Centre for Economic Development, Transport and the Environment for Uusimaa,SYKE | ||
|Investigation and design Lead organisation=Centre for Economic Development, Transport and the Environment fo Uusimaa | |||
|Project completed= | |||
|Total cost category= | |||
|Total1 cost= | |||
|Funding sources= | |||
|Investigation and design Lead organisation= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 163: | Line 87: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Building of submerged weirs and pits,Introduction of gravel, Creation of fish passes, | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 190: | Line 99: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 198: | Line 105: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 08:37, 2 June 2017
Location: 60° 12' 59.21" N, 24° 14' 42.69" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx |
Themes | Fisheries, Habitat and biodiversity |
Country | Finland |
Main contact forename | Esa |
Main contact surname | Lehtinen |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for Uusimaa |
Contact organisation web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|