Case study:Sågarsfors: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(19 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 12: Line 7:
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Habitat and biodiversity
|Project web site url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx
|Themes=Fisheries, Habitat and biodiversity
|Country=Finland
|Country=Finland
|Main contact forename=Jukka
|Main contact forename=Esa
|Main contact surname=Jormola
|Main contact surname=Lehtinen
|Contact organisation=SYKE
|Contact organisation=Centre for Economic Development, Transport and the Environment for Uusimaa
|Contact organisation url=www.environment.fi
|Contact organisation url=www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx
|Multi-site=No
|Multi-site=No
|Project picture=600px after Sagarsfors 26082010.jpg
|Picture description=After restoration. Photo by Esa Lehtinen
|Project summary=The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.
}}
{{Image gallery}}
{{Case study image
|File name=Sagarsfors Before dam removal.JPG
|Caption=Before dam removal (Jukka Jormola)
}}
{{Case study image
|File name=Sagarsfors Before dam removal (2).JPG
|Caption=Before dam removal (Jukka Jormola)
}}
{{Case study image
|File name=Sagarsfors Dam removal.JPG
|Caption=Work (Jukka Jormola)
}}
{{Case study image
|File name=Sagarsfors After dam removal.JPG
|Caption=After dam removal (Jukka Jormola)
}}
{{Case study image
|File name=Sagarsfors After damremoval(2).JPG
|Caption=After dam removal (Jukka Jormola)
}}
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 27: Line 51:
}}
}}
{{Site
{{Site
|Name=
|Name=Sågarsfors dam
   
|Pre-project morphology=Ponded
   
|Reference morphology=Artificial channel
      Sågarsfors dam
|Heavily modified water body=No
|WFD water body code=
|Protected species present=Yes
     
|Invasive species present=No
|WFD (national) typology=
|Species=Sea trout (Salmo trutta), freshwater pearl mussel (Margaritifera margaritifera)
     
|Dominant hydrology=Artificially regulated
|WFD water body name=
|Mean discharge category=1 - 10 m³/s
     
|Mn discharge=2,8
|Pre-project morphology=
      Ponded
|Reference morphology=
      Artificial channel
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
      Artificially regulated
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=500
   
|Project started=2006/01/01
   
|Works started=2007/09/02
     
|Project completed=2010/12/31
|Project started=
|Total cost category=50 - 100 k€
      2007/01/01
|Total1 cost=100
|Works started=
|Funding sources=Centre for Economic Development, Transport and the Environment for Uusimaa,SYKE
     
|Investigation and design Lead organisation=Centre for Economic Development, Transport and the Environment fo Uusimaa
|Works completed=
     
|Project completed=
     
|Total cost category=
     
|Total1 cost=
     
|Funding sources=
      Centre for Economic Development, Transport and the Environment,SYKE
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 163: Line 87:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Building of submerged weirs and pits,Introduction of gravel, Creation of fish passes,
   
   
      Building fishway,Introducing gravel,Building of submerged weirs and pits,Introducing stones
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 190: Line 99:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 198: Line 105:
{{Supplementary_Information
{{Supplementary_Information
|Information=
|Information=
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 08:37, 2 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 12' 59.21" N, 24° 14' 42.69" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx
Themes Fisheries, Habitat and biodiversity
Country Finland
Main contact forename Esa
Main contact surname Lehtinen
Main contact user ID
Contact organisation Centre for Economic Development, Transport and the Environment for Uusimaa
Contact organisation web site http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
After restoration. Photo by Esa Lehtinen

Project summary

Edit project overview to modify the project summary.


The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Before dam removal (Jukka Jormola)
Before dam removal (Jukka Jormola)
Work (Jukka Jormola)
After dam removal (Jukka Jormola)
After dam removal (Jukka Jormola)
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Siuntionjoki River Basin
River basin

Subcatchment

River name Siuntionjoki River
Area category 100 - 1000 km²
Area (km2) 230 km²23,000 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover
Waterbody ID



Site

Name Sågarsfors dam
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Ponded
Reference morphology Artificial channel
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present No
Species of interest Sea trout (Salmo trutta), freshwater pearl mussel (Margaritifera margaritifera)
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category 1 - 10 m³/s
Mean annual discharge (m3/s) 2,8",8" is not declared as a valid unit of measurement for this property.
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 500500 m <br />0.5 km <br />50,000 cm <br />
Project started 2006/01/01
Works started 2007/09/02
Works completed
Project completed 2010/12/31
Total cost category 50 - 100 k€
Total cost (k€) 100100 k€ <br />100,000 € <br />
Benefit to cost ratio
Funding sources Centre for Economic Development, Transport and the Environment for Uusimaa, SYKE

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Centre for Economic Development, Transport and the Environment fo Uusimaa
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information