Case study:Restoration of Vakkolankoski Torrent: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 18: | Line 13: | ||
|Contact organisation=Centre for Economic Development, Transport and the Environment for Uusimaa | |Contact organisation=Centre for Economic Development, Transport and the Environment for Uusimaa | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Vakkolankoski torrent was restored as a part of the Porvoonjoki River restoration project for migrating fish. The power plant and the dam in the torrent has been obstacle for fish migration to the upstream reaches. The aim of the project was to enable fish migration by constucting the bypass channel to pass the dam. Slight meanders were excavated and stones and gravel were placed to increase the biodiversity of the brook and to create fish habitats. The restoration took place in 2008-2009 and the project was accomplished in co-operation between Centre for Economic Development, Transport and the Environment for Uusimaa and the municipality of Askola and NGO´s. Costs of the whole restoration was 232 000 euros. | |Project picture=Vakkolankoski.JPG | ||
|Project summary=Vakkolankoski torrent was restored as a part of the Porvoonjoki River restoration project for migrating fish. The power plant and the dam in the torrent has been obstacle for fish migration to the upstream reaches. The aim of the project was to enable fish migration by constucting the bypass channel to pass the dam. Slight meanders were excavated and stones and gravel were placed to increase the biodiversity of the brook and to create fish habitats. The restoration took place in 2008-2009 and the project was accomplished in co-operation between Centre for Economic Development, Transport and the Environment for Uusimaa and the municipality of Askola and NGO´s. Costs of the whole restoration was 232 000 euros. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Restoration of Vakkolankoski Torrent construction of the fishway.JPG | |||
|Caption=Construction of the fishway | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 163: | Line 167: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes, | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 190: | Line 179: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 223: | Line 206: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 08:37, 2 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Finland |
Main contact forename | Olli |
Main contact surname | Jaakonaho |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for Uusimaa |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Vakkolankoski torrent was restored as a part of the Porvoonjoki River restoration project for migrating fish. The power plant and the dam in the torrent has been obstacle for fish migration to the upstream reaches. The aim of the project was to enable fish migration by constucting the bypass channel to pass the dam. Slight meanders were excavated and stones and gravel were placed to increase the biodiversity of the brook and to create fish habitats. The restoration took place in 2008-2009 and the project was accomplished in co-operation between Centre for Economic Development, Transport and the Environment for Uusimaa and the municipality of Askola and NGO´s. Costs of the whole restoration was 232 000 euros.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|