Case study:Abbey Brook Weir: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(9 intermediate revisions by 5 users not shown)
Line 9: Line 9:
|Themes=Fisheries, Habitat and biodiversity, Hydropower
|Themes=Fisheries, Habitat and biodiversity, Hydropower
|Country=Wales
|Country=Wales
|Main contact forename=Nick
|Main contact forename=Richard
|Main contact surname=Elbourne
|Main contact surname=Lucas
|Contact organisation=River Restoration Centre
|Contact organisation=Welsh Dee Trust
|Contact organisation url=www.welshdeetrust.com/
|Multi-site=No
|Multi-site=No
|Project picture=Abbeyweir.png
|Project picture=Abbeyweir.png
|Picture description=Before and after weir removal on the Abbey brook
|Picture description=Before and after weir removal on the Abbey brook
}}
}}
{{Image gallery}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=Dee (Wales)
|Subcatchment=Eglwyseg
}}
}}
{{Site
{{Site
|Name=Abbey Brook at Llangollen
|Name=Abbey Brook at Llangollen
|Pre-project morphology=Impounded,  
|WFD water body code=GB111067052080
|Reference morphology=stepped pool, Sinuous,  
|WFD water body name=Eglwyseg
|Pre-project morphology=Impounded,
|Reference morphology=Sinuous, Step-pool,
|Heavily modified water body=No
|Heavily modified water body=No
|Protected species present=No
|Protected species present=No
|Invasive species present=No
|Invasive species present=No
|Species=Salmon, Sea trout (Salmo trutta),  
|Species=Salmon, Sea trout (Salmo trutta),
|River corridor land use=Intensive agriculture (arable), Improved/semi-improved grassland/pasture, Woodland,  
|River corridor land use=Intensive agriculture (arable), Improved/semi-improved grassland/pasture, Woodland,
}}
}}
{{Project background
{{Project background
Line 33: Line 40:
|Project completed=2011/11/01
|Project completed=2011/11/01
}}
}}
{{Motivations}}
{{Motivations
{{Measures}}
|Specific mitigation=Barriers to fish migration,
}}
{{Measures
|Bank and bed modifications measure=Rock ramp construction, Creation of fish passes,
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}
Line 45: Line 56:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 52: Line 61:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Latest revision as of 08:22, 2 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 59' 13.60" N, 3° 11' 11.70" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydropower
Country Wales
Main contact forename Richard
Main contact surname Lucas
Main contact user ID
Contact organisation Welsh Dee Trust
Contact organisation web site http://www.welshdeetrust.com/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Before and after weir removal on the Abbey brook

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Dee
River basin Upper Dee

Subcatchment

River name Eglwyseg
Area category 10 - 100 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 562562 m <br />0.562 km <br />56,200 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Heather
Waterbody ID GB111067052080



Site

Name Abbey Brook at Llangollen
WFD water body codes GB111067052080
WFD (national) typology
WFD water body name Eglwyseg
Pre-project morphology Impounded
Reference morphology Sinuous, Step-pool
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest Salmon, Sea trout (Salmo trutta)
Dominant hydrology
Dominant substrate
River corridor land use Intensive agriculture (arable), Improved/semi-improved grassland/pasture, Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2011/08/01
Works started
Works completed
Project completed 2011/11/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Rock ramp construction, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information