Case study:Restoration of Vakkolankoski Torrent: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 167: Line 167:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=Building fishway,Building of submerged weirs and pits, Introduction of gravel,
|Bank and bed modifications measure=Building fishways,Building of submerged weirs and pits, Introduction of gravel,
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Revision as of 08:13, 2 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 31' 0.17" N, 25° 34' 52.60" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Finland
Main contact forename Olli
Main contact surname Jaakonaho
Main contact user ID
Contact organisation Centre for Economic Development, Transport and the Environment for Uusimaa
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Vakkolankoski torrent was restored as a part of the Porvoonjoki River restoration project for migrating fish. The power plant and the dam in the torrent has been obstacle for fish migration to the upstream reaches. The aim of the project was to enable fish migration by constucting the bypass channel to pass the dam. Slight meanders were excavated and stones and gravel were placed to increase the biodiversity of the brook and to create fish habitats. The restoration took place in 2008-2009 and the project was accomplished in co-operation between Centre for Economic Development, Transport and the Environment for Uusimaa and the municipality of Askola and NGO´s. Costs of the whole restoration was 232 000 euros.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Construction of the fishway
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Porvoonjoki River Basin
River basin

Subcatchment

River name Vakkolankoski Torrent
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Fenno-Scandian Shield
Dominant land cover Intensive agriculture (arable)
Waterbody ID



Site

Name Vakkolankoski Torrent
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Ponded
Reference morphology Step-pool
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral
Dominant substrate
River corridor land use Intensive agriculture (arable)
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2008/01/01
Works started
Works completed 2009/01/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 232 k€232,000 € <br />
Benefit to cost ratio
Funding sources Regional ELY-centre, Regional Environment Institute, Municipality of Askola

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Building fishways, Building of submerged weirs and pits, Introduction of gravel
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information