Case study:Rio Tepice urban restoration: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(15 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=45.01231441444817, 7.816817522179917
|Location=45.010046513508726, 7.817300319802598
}}
}}
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Habitat and biodiversity, Social benefits, Spatial planning
|Themes=Habitat and biodiversity, Social benefits, Spatial planning, Urban
|Country=Italy
|Country=Italy
|Main contact forename=Guido
|Main contact forename=Guido
Line 21: Line 16:
|Project picture=Overview.jpg
|Project picture=Overview.jpg
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri
|Picture description=The restored stretch of Rio Tepice in the urban area of  Chieri
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO)throught these kind of actions:
|Project summary=This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions:  
- restoration (cutting, new plantations with autoctonous species, bioengeneering works)of the riparian vegetation and of the river banks;
* restoration (cutting, new plantations with autochthonous species, bioengineering works) of the riparian vegetation and of the river banks;  
- revegetation of an area of ​​1.08 hectare previously occupied by a manufacturing;
* revegetation of an area of 1.08 hectares;
- creation of new footpaths adjacent to the watercourse
Moreover new footpaths adjacent to the watercourse were created.
}}
{{Image gallery}}
{{Case study image
|File name=Bioengineering works.jpg
|Caption=Bioengineering works
}}
}}
{{Case study image
|File name=Pre-post.jpg
|Caption=During and after works
}}
{{Case study image
|File name=Chieri after.jpg
|Caption=The tepice stream after restoration
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=Tepice
|Subcatchment=Tepice
Line 71: Line 84:
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=
|Hydromorphological quality elements=Channel pattern/planform
   
|Other motivation=Landscape and enjoyment enhancement
   
      Channel pattern/planform
|Biological quality elements=
     
|Physico-chemical quality elements=
      Nutrient concentrations
|Specific mitigation=
     
|Other motivation=
      Landscape enhancement
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=embankement renaturalization
|Bank and bed modifications measure=Bank improvement,
|Floodplain / River corridor=Riparian tree planting
|Floodplain / River corridor=Riparian planting
|Management interventions=Management of paths
|Management interventions=Management of paths
|Social measures=Public green area building
|Social measures=Public green area
|Wider stakeholder / citizen engagement=Participation in monitoring
|Wider stakeholder / citizen engagement=Participation in monitoring
}}
}}
Line 144: Line 147:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
{{Case study image
|File name=Bioengineering works.jpg
|Caption=Bioengineering works
}}
{{Case study image
|File name=Pre-post.jpg
|Caption=During and after works
}}
{{Case study image
|File name=Aerial view pre-post.pdf
|Caption=Aerial view before and after
}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 182: Line 171:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 13:38, 1 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 45° 0' 36.17" N, 7° 49' 2.28" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Social benefits, Spatial planning, Urban
Country Italy
Main contact forename Guido
Main contact surname Blanchard
Main contact user ID
Contact organisation Studio Blanchard-Gallo
Contact organisation web site http://www.coqblanc.it/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The restored stretch of Rio Tepice in the urban area of Chieri

Project summary

Edit project overview to modify the project summary.


This project concerned the restoration of a stretch of Rio Tepice in the urban area of Chieri (TO) through this kind of actions:

  • restoration (cutting, new plantations with autochthonous species, bioengineering works) of the riparian vegetation and of the river banks;
  • revegetation of an area of 1.08 hectares;

Moreover new footpaths adjacent to the watercourse were created.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Bioengineering works
During and after works
The tepice stream after restoration


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Po
River basin Po Piemontese

Subcatchment

River name Tepice
Area category 10 - 100 km²
Area (km2) 15 km²1,500 ha <br />
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 660 m0.66 km <br />66,000 cm <br />
Dominant geology Calcareous, Mixture
Ecoregion Italy and Corsica
Dominant land cover Urban, Woodland
Waterbody ID



Site

Name Rio Tepice in Chieri
WFD water body codes 0010941pi
WFD (national) typology 06SS2T
WFD water body name
Pre-project morphology Single channel, High width:depth
Reference morphology Pool-riffle
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Quick run-off
Dominant substrate Cobble
River corridor land use Urban
Average bankfull channel width category Less than 2 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 1.51.5 m³/s <br />1,500 l/s <br />
Average channel gradient category
Average channel gradient 0.013
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 250 m0.25 km <br />25,000 cm <br />
Project started 1993/03/01
Works started 1996/05/01
Works completed 1997/12/01
Project completed 1997/12/01
Total cost category 100 - 500 k€
Total cost (k€) 123 k€123,000 € <br />
Benefit to cost ratio
Funding sources Piermonte region, Chieri municiplaity

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 1 - 10 k€ 7 k€7,000 € <br /> Studio Blanchard-Gallo Guido Blanchard
Stakeholder engagement and communication
Works and works supervision 100 - 500 k€ Studio Blanchard-Gallo Guido Blanchard
Post-project management and maintenance 10 - 50 k€ Chieri municiplaity
Monitoring “Il tuo Parco” association Luca Bruno



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project Landscape and enjoyment enhancement


Measures

Structural measures
Bank/bed modifications Bank improvement
Floodplain / River corridor Riparian planting
Planform / Channel pattern
Other
Non-structural measures
Management interventions Management of paths
Social measures (incl. engagement) Public green area
Other Participation in monitoring


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Structure & condition of riparian zones Yes Yes Yes Improvement

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Ex ante status "Il Rio Tepice nel suo Viaggio verso il Po" Ass. Il tuo Parco


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.coqblanc.it/public/schedeA3 Chieri tepice.ppt Presentation of the project actions

Supplementary Information

Edit Supplementary Information