Case study:Malltraeth Marsh: Difference between revisions
No edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 36: | Line 36: | ||
{{Site | {{Site | ||
|Name=Malltraeth Marsh | |Name=Malltraeth Marsh | ||
|Pre-project morphology=Embanked, Straightened, | |WFD water body code=GB110102058670 | ||
|WFD water body name=Cefni - tidal limit to Ceint | |||
|Pre-project morphology=Embanked, Straightened, | |||
|Reference morphology=Wetland marsh | |Reference morphology=Wetland marsh | ||
|Heavily modified water body=No | |Heavily modified water body=No | ||
|Site designation=UK - Site of Special Scientific Interest | |Site designation=UK - Site of Special Scientific Interest | ||
|Local site designation=Special Area of Conservation, | |Local site designation=Special Area of Conservation, | ||
|Protected species present=No | |Protected species present=No | ||
|Invasive species present=No | |Invasive species present=No | ||
|River corridor land use=Wetland, Rough unimproved grassland/pasture, | |River corridor land use=Wetland, Rough unimproved grassland/pasture, | ||
}} | }} | ||
{{Project background | {{Project background | ||
Line 54: | Line 56: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=excavation of historic channels, | |Bank and bed modifications measure=excavation of historic channels, Bed raising, | ||
|Floodplain / River corridor=Creation of | |Floodplain / River corridor=Creation of wetland, Floodplain reconnection, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Latest revision as of 09:37, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Wales |
Main contact forename | Ian |
Main contact surname | Hawkins |
Main contact user ID | |
Contact organisation | RSPB Cymru |
Contact organisation web site | http://www.rspb.org.uk/reserves/guide/m/malltraethmarsh/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The channel was canalised, embanked, and virtually featureless carrying highland water from upstream across a flat lowland valley. Marsh either side is grazing land designated as SSSI.
Aims of the project:
• To restore the open water characteristics of remnant cut-off channels of the Cefni that were being to be lost through drying and reed/rush/sweet-grass invasion.
• Combined with local restoration of high water tables, these measures ensured that the wildlife interests which gave rise to its notification as an SSSI are maintained and enhanced.
Works carried out:
• excavation of drying relic meanders and other open water areas
• sluices on drains/ditches to raise water levels in summer
• sluices and/or bunds to raise winter water levels
• willow/scrub control and other vegetation management
• improved bank profiles to the many ditches that traverse the floodplain
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|