Case study:Vén-Duna (Old-Danube) sidearm’s revitalization: Difference between revisions
No edit summary |
No edit summary |
||
Line 169: | Line 169: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Weir removal, Dredging | ||
|Floodplain / River corridor=Construction of new sluices | |||
|Management interventions=Ensuring biodiversity | |||
|Social measures=Recreation | |||
|Floodplain / River corridor= | |Wider stakeholder / citizen engagement=Information provision,Consultation | ||
|Management interventions= | |||
|Social measures= | |||
|Wider stakeholder / citizen engagement= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 09:52, 31 May 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Monitoring, Water quality |
Country | Hungary |
Main contact forename | Bela |
Main contact surname | Csanyi |
Main contact user ID | |
Contact organisation | „VITUKI” Environmental and Water Management Research. Institute Non-Profit Public LLC |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The aim of the project was to obtain knowledge and experience on possibilities how to restore natural hydro-morphologic conditions and the connectivity between the river and floodplain zone. The main objective of the implementations was to provide a direct water flow connection between the Danube main stream and the side arm in order to restore the natural biodiversity and rheophilic communities typical for aquatic floodplain landscapes. The re-opening was accompanied by an extensive scientific research and monitoring program, which showed changes in riverbed morphology upstream and downstream of the rock dam. Restored high floods increased sediment transport, erosion and deposition. Suitable habitats for rheophilous invertebrate and fish species as well as species diversity and population numbers typical for dynamic water bodies increased.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|