Case study:Creamery Weir fish barrier easement: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Robmitchell (talk | contribs) No edit summary |
||
Line 19: | Line 19: | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=Creamery Weir.jpg | |||
}} | |||
{{Case study image | |||
|File name=Creamery Weir left bank.jpeg | |||
}} | |||
{{Case study image | |||
|File name=Creamery Weir from downstream.jpeg | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} |
Revision as of 14:25, 25 January 2017
Location: 54° 52' 23.38" N, 4° 4' 4.97" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology |
Country | Scotland |
Main contact forename | Rob |
Main contact surname | Mitchell |
Main contact user ID | |
Contact organisation | RAFTS |
Contact organisation web site | http://www.rafts.org.uk |
Partner organisations | Galloway Fisheries Trust, SEPA |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
This project aims to ease a barrier to migratory fish to allow access to over 10km of habitat. A feasibility and options report led to the selection of removal as a preferred option. This is being progressed to design at present. There are significant volumes of sediment that have accumulated behind the weir so this project will have a strong element of hydromorphological restoration, as well as improving fish passage.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|