Case study:More space for the river Orbigo: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 53: Line 53:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=recette.nwrm.eu/sites/default/files/case_studies_ressources/nwrm_cs_factsheet_es_02_orbigo_0611_.pdf
|Description=factsheet
}}
{{Additional links and references
|Link=www.chduero.es/Inicio/Publicaciones/DVDsyAudiovisuales/tabid/586/Default.aspx
|Description=video
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 07:59, 21 May 2015

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 42° 31' 38.29" N, 5° 51' 36.39" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity, Hydromorphology, Social benefits
Country Spain
Main contact forename José Ignacio
Main contact surname Santillán
Main contact user ID
Contact organisation Confederación Hidrográfica del Duero
Contact organisation web site http://www.chduero.es
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Removal of embankment along the Orbigo

Project summary

Edit project overview to modify the project summary.


The EU Directive on the assessment and management of flood risks (2007/60/EC) presents a new approach to tackle flood risk management, based primarily on the prevention, protection, and preparedness, with the promotion of measures for river restoration, prediction of floods, civil protection or land management. This represents a shift over the traditional, structural approach, to the principle of avoiding unneccessary deterioration of river ecosystems, as set out in the Water Framework Directive. The project on the river Órbigo responds to these premises. The actions have been aimed at the recovery of the river area and of the functionality of the floodplain to increase the efficiency in the dissipation of floods, and to start the self-ecological recovery by connecting the river with related riparian areas. The project was one of the IRF European Riverprize finalists in 2013.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H. Duero
River basin Duero

Subcatchment

River name Orbigo
Area category
Area (km2) 49904,990 km² <br />499,000 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 22002,200 k€ <br />2,200,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Flood risk management


Measures

Structural measures
Bank/bed modifications Removal/retreat of embankments
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://recette.nwrm.eu/sites/default/files/case studies ressources/nwrm cs factsheet es 02 orbigo 0611 .pdf factsheet
http://www.chduero.es/Inicio/Publicaciones/DVDsyAudiovisuales/tabid/586/Default.aspx video

Supplementary Information

Edit Supplementary Information