Case study:Ecological Restoration of Natural Lake Pochina: Difference between revisions
No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
|Picture description=Lower Prut Natural Park | |Picture description=Lower Prut Natural Park | ||
|Project summary=The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds.More than 50 of these birds are listed in the EU Birds Directive and in the Bern Convention.The ecological importance of the park has been recognised at national as well as international levels. | |Project summary=The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds.More than 50 of these birds are listed in the EU Birds Directive and in the Bern Convention.The ecological importance of the park has been recognised at national as well as international levels. | ||
The project objective | The project objective was to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park. | ||
The first phase of the multi-site project focuses on the establishment of park administrative structures and the preparation of an integrated management plan, to be approved by the local authorities. This plan would guide the conservation activities to be implemented and would consider the protection needs of target habitats and species of the project. A number of actions | The first phase of the multi-site project focuses on the establishment of park administrative structures and the preparation of an integrated management plan, to be approved by the local authorities. This plan would guide the conservation activities to be implemented and would consider the protection needs of target habitats and species of the project. A number of actions have been foreseen to address and involve the local community (e.g. dissemination, consultation of every village in the area, and active participation and education with local educational material to be produced). The project was addressed stakeholders in wide variety of ways, including picture books, nature trails, six annual environment days with expeditions into the area, children's exhibitions, and bird watching towers. | ||
The ecological restoration works of Pochina Lake assures, by gravitational transfer a sufficient water volum to contribute to the conservation of this special area, designated Special Protected Area (SPA). | The ecological restoration works of Pochina Lake assures, by gravitational transfer a sufficient water volum to contribute to the conservation of this special area, designated Special Protected Area (SPA). | ||
}} | }} |
Revision as of 08:30, 7 September 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.luncaprut.ro |
Themes | Habitat and biodiversity |
Country | Romania |
Main contact forename | Fica |
Main contact surname | Boldea |
Main contact user ID | |
Contact organisation | Prut - Barlad River Basin Authority |
Contact organisation web site | http://www.rowater.ro/daprut/default.aspx |
Partner organisations | University of Bucharest – Centre for Environmental Research and Impact Studies, Romania; Romanian Ornithological Society, Romania; Galaţi Forestry District, Romania |
This is a parent project encompassing the following projects |
Ecological Restoration of Natural Lake Pochina |
Project summary
The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds.More than 50 of these birds are listed in the EU Birds Directive and in the Bern Convention.The ecological importance of the park has been recognised at national as well as international levels.
The project objective was to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park.
The first phase of the multi-site project focuses on the establishment of park administrative structures and the preparation of an integrated management plan, to be approved by the local authorities. This plan would guide the conservation activities to be implemented and would consider the protection needs of target habitats and species of the project. A number of actions have been foreseen to address and involve the local community (e.g. dissemination, consultation of every village in the area, and active participation and education with local educational material to be produced). The project was addressed stakeholders in wide variety of ways, including picture books, nature trails, six annual environment days with expeditions into the area, children's exhibitions, and bird watching towers.
The ecological restoration works of Pochina Lake assures, by gravitational transfer a sufficient water volum to contribute to the conservation of this special area, designated Special Protected Area (SPA).
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Prut Barlad |
Subcatchment
River name | Prut |
---|---|
Area category | Less than 10 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Eastern Plains |
Dominant land cover | |
Waterbody ID |
Other case studies in this subcatchment: Ecological Restoration of Mata-Radeanu Complex, Ecological Restoration of Vlascuta Lake, The Ciobarciu Wetland Project
Site
Name | Pochina Lake |
---|---|
WFD water body codes | ROLW13.1_B5.2 |
WFD (national) typology | ROLN01 |
WFD water body name | |
Pre-project morphology | Side ponds |
Reference morphology | Single channel, Supply channel and discharge channel wich gravitational transfer a sufficient water volum to contribute to the conservation of this special area |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Silt, Sedimentary rocks (mixture of sand and mud of fluviatile origin). |
River corridor land use | Wetland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2005/11/01 |
Works started | 2006/05/01 |
Works completed | 2006/06/01 |
Project completed | |
Total cost category | 10 - 50 k€ |
Total cost (k€) | 31 k€31,000 € <br /> |
Benefit to cost ratio | |
Funding sources | From LIFE Nature Programm; Co-financig Ministry of Environment and County Council Galati, Regional Agenty for Environmental Protection Galati (RAEP Galati) |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Less than 1 k€ | 0.737 k€737 € <br /> | Regional Agenty for Environmental Protection Galati (REPA Galati) | Fica | Boldea |
Stakeholder engagement and communication | Regional Agenty for Environmental Protection Galati (RAEP Galati) | Fica | Boldea | ||
Works and works supervision | Less than 1 k€ | 0.368 k€368 € <br /> | |||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Width & depth variation |
Biology | |
Physico-chemical | Oxygen balance |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | The two channels for Vlăşcuţa Lake (in total length of about 542 m) were reshaped and consolidated, so that they assure the supply and the evacuation from/to lake/river Prut, subject to necessary water level of the lake. |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Information provision |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Width & depth variation | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.wise-rtd.info | The web-site of Water Knowledge Portal |
http://www.mmediu.ro | Web-site of The Romanian Ministry of Environment and Forests |
http://www.ser.org | Web-site of The Society for Ecological Restoration |