Case study:Flood detention basin (HRB) Mengede: Difference between revisions
No edit summary |
No edit summary |
||
Line 28: | Line 28: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
|Subcatchment=Emscher | |||
}} | |||
{{Site}} | {{Site}} | ||
{{Project background}} | {{Project background}} |
Revision as of 14:32, 14 May 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | Germany |
Main contact forename | Mechthild |
Main contact surname | Semrau |
Main contact user ID | User:EGLV |
Contact organisation | Emschergenossenschaft |
Contact organisation web site | http://eglv.de |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Part of the integrated river basin management for the Emscher Region (865 km2, 2.700 inhabitants/ km2) is the revitalization of the river Emscher and its tributaries. Due to industrialization the waterbodies were systematically developed as open wastewater sewers in the beginning of the 20th century. Economic and technical alternatives such as closed sewer systems could not be implemented due to constant subsidence caused by coal mining.
Momentarily, the river system is being restructured, so that the Emscher will once again become a fully functioning, continuous water-based ecosystem with typical topology and vegetation.
An ecological concept based on the assumption of a non-interrupted river as a connection from the source to the mouth has been developed.
Studies on the feasibility of restructuring the Emscher show, that due to coal mining, industrial impacts and population changes the “original” conditions can never be reached again. It will not be possible to return the Emscher to its original, meandering state. Therefore, the reference conditions are no direct goals for the river restoration, but they give orientation in the planning procedure. One of the first hot spots to realize is the HRB Mengede. The HRB will comprise an area of 30 ha, where a typical lowland river with natural substrats, features and vegetation can be formed. A varied mosaic of biotopes, which are typical for floodplains (alder floodplain forest, sedge, typha and phragmites reed, floodgrass and potamogeton) is expected to develop. Two million m3 of native soil hav to be excavated. Half of which will be used to build dikes.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Upper Emscher
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|