Case study:Timber float restorations at River Iijoki: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url=www.ymparisto.fi/default.asp?node=5579&lan=fi | |||
|Themes=Land use management - forestry | |Themes=Land use management - forestry | ||
|Country=Finland | |Country=Finland |
Revision as of 10:19, 28 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 65° 19' 28.71" N, 25° 25' 40.83" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ymparisto.fi/default.asp?node=5579&lan=fi |
Themes | Land use management - forestry |
Country | Finland |
Main contact forename | Yrjänä |
Main contact surname | Timo |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Restoration of Kostonjoki River |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Iijoki River basin |
---|---|
River basin | Iijoki River Basin |
Subcatchment
River name | Iijoki River |
---|---|
Area category | more than 10000 km² |
Area (km2) | 14191 km²1,419,100 ha <br /> |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 370 m0.37 km <br />37,000 cm <br /> |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Woodland |
Waterbody ID |
Site
Name | Cathment of River Kostonjoki |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Straight, High width:depth |
Reference morphology | Sinuous, Braided |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | Cobble |
River corridor land use | Woodland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | 2.5 m0.0025 km <br />250 cm <br /> |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 1988/01/01 |
Works started | |
Works completed | 2011/01/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Ministry of Agriculture and Forestry |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Centre for Economic Development, Transport and the Environment | Timo | Yrjänä | ||
Stakeholder engagement and communication | |||||
Works and works supervision | Centre for Economic Development, Transport and the Environment | Timo | Yrjänä | ||
Post-project management and maintenance | |||||
Monitoring | Metsähallitus, federal forestry center |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building submerged weirs, Removal of old logs, Re-introducing stones, Removal of revetments |
Floodplain / River corridor | |
Planform / Channel pattern | Introducing sinuosity |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Quantity & dynamics of flow | Yes | Improvement | ||||
Width & depth variation | Yes | Improvement | ||||
Channel pattern/planform | Yes | Improvement | ||||
Flow velocities | Yes | Improvement | ||||
Structure & condition of riparian zones | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Abundance | Yes | Awaiting results | ||||
Fish: Disturbance-sensitive species | Yes | Awaiting results | ||||
Invertebrates: Disturbance-sensitive species | Yes | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|