Case study:Weir demolition in river Nansa, Cantabria: Difference between revisions
No edit summary |
No edit summary |
||
| Line 21: | Line 21: | ||
This project counts with the support of national institutions. The financing comes from the North Hydrographic Confederation and the Ministry of Environment. The total budget for carry out the rehabilitation is 93.779,55€. | This project counts with the support of national institutions. The financing comes from the North Hydrographic Confederation and the Ministry of Environment. The total budget for carry out the rehabilitation is 93.779,55€. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=008 Rio Nansa CHCANTABRICO 004.jpg | |||
|Caption=Aerial view of Nansa River in Camijares | |||
}} | |||
{{Case study image | |||
|File name=008 Rio Nansa CHCANTABRICO 004 I.jpg | |||
|Caption=Nansa Basin area map with the main cross barriers | |||
}} | |||
{{Case study image | |||
|File name=008 Rio Nansa CHCANTABRICO 004 II.jpg | |||
|Caption=Dam of Camijares before works | |||
}} | |||
{{Case study image | |||
|File name=008 Rio Nansa CHCANTABRICO 004 III.jpg | |||
|Caption=Nansa River after completion of works | |||
}} | |||
{{Case study image | |||
|File name=008 Rio Nansa CHCANTABRICO 004 IV.jpg | |||
|Caption=Palombrera dam | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
| Line 191: | Line 216: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
| Line 234: | Line 237: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} | |||
Revision as of 18:13, 6 September 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | |
| Country | Spain |
| Main contact forename | The North Hydrographic Confederation |
| Main contact surname | The North Hydrographic Confederation |
| Main contact user ID | |
| Contact organisation | Oficina regional de Comisaría de Aguas y Dirección Técnica, C.H. Cantábrico |
| Contact organisation web site | |
| Partner organisations | |
| Parent multi-site project | |
| This is a parent project encompassing the following projects |
No |
Project summary
The weir of Camijanes was in obsolete, preventing proper connectivity of the river. The hydroelectric reservoirs are located upstream in the reservoir or the Cohilla and the dam Palombera, although there are many scattered water intakes that feed the river through mini-channels. Many of the abstractions are illegal.
The main objective of the project is recovering natural local continuity for the river through the removal of the weir of Camijares (90x5x3).
This project counts with the support of national institutions. The financing comes from the North Hydrographic Confederation and the Ministry of Environment. The total budget for carry out the rehabilitation is 93.779,55€.
Monitoring surveys and results
Lessons learnt
Image gallery
|
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and referencesSupplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
