Case study:Revitalisation of Nagy-Pándzsa watersystem: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
|Project summary=Restoring the Nagy-Pándzsa watersystem's transport capacity and the reconstruction of the Helbényi sluice at the Holt-Marcal estuarine will improve flood protection, contribute to the improvement of overall water quality and pollution reduction. as A result of the development the flora and the fauna of the water will regenerate , safe water supply for fish ponds will be ensured. | |Project summary=Restoring the Nagy-Pándzsa watersystem's transport capacity and the reconstruction of the Helbényi sluice at the Holt-Marcal estuarine will improve flood protection, contribute to the improvement of overall water quality and pollution reduction. as A result of the development the flora and the fauna of the water will regenerate , safe water supply for fish ponds will be ensured. | ||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 288: | Line 292: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 334: | Line 336: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Revision as of 11:21, 6 September 2013
This case study is pending approval by a RiverWiki administrator.
Location: 47° 39' 1.67" N, 17° 36' 53.20" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.edukovizig.hu/node/941 |
Themes | Flood risk management, Habitat and biodiversity |
Country | Hungary |
Main contact forename | Emil |
Main contact surname | Janák |
Main contact user ID | |
Contact organisation | North-Transdanubian Water Management Directorate titkarsag@edukovizig.hu |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Restoring the Nagy-Pándzsa watersystem's transport capacity and the reconstruction of the Helbényi sluice at the Holt-Marcal estuarine will improve flood protection, contribute to the improvement of overall water quality and pollution reduction. as A result of the development the flora and the fauna of the water will regenerate , safe water supply for fish ponds will be ensured.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|