Case study:Restoration of Vesselina River: Difference between revisions
(XML import) |
No edit summary |
||
(11 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=43.030141495241, 25.82609935752 | ||
}} | |||
{{Project overview | |||
|Status=Complete | |||
|Themes=Hydromorphology | |||
|Country=Bulgaria | |||
|Main contact forename=Ivan | |||
|Main contact surname=Hristov | |||
|Contact organisation=WWF Danube Carpathian programme Bulgaria | |||
|Contact organisation url=www.wwf.bg | |||
|Multi-site=No | |||
|Project picture=BoardBG.jpg | |||
|Picture description=Vasselina River area | |||
|Project summary=WWF together with local people from Mindya village in the region of Veliko Turnovo, restored the connection of Veselina River, a tributary of Yantra, with its former meander near the village. When the river meander was cut off back in time, the river dug nearly 150 cm deeper into its bed, so now a threshold had to be built to raise its level enough for enabling it run back to its old bed. | |||
The project objective is by conducting a number of technical, environmental and forest management activities to achieve ecosystem restoration of the river Vesselina in particular: • Conservation and restoration of biodiversity in isolated old bed of the river and correction of Vesselina river near by Mindya village; • Create favorable conditions for development of recreation and tourism in the region; • Reduce the level of flood risk; • Optimization of groundwater level and reduce the impact of drought and floods on agricultural land in river terrace; • Reduction of erosion; • Increased self-purification capacity of water flow in the region of isolated old bed of the river. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Slide1.JPG | |||
|Caption=Vesselina River - before restoration | |||
}} | |||
{{Case study image | |||
|File name=Slide2.JPG | |||
|Caption=Vesselina River - during restoration | |||
}} | |||
{{Case study image | |||
|File name=Slide3.JPG | |||
|Caption=Vesselina River - during restoration | |||
}} | |||
{{Case study image | |||
|File name=Slide4.JPG | |||
|Caption=Vesselina River - during restoration | |||
}} | }} | ||
{{ | {{Case study image | ||
| | |File name=Slide7.JPG | ||
|Caption=Vesselina River - after restoration | |||
| | |||
}} | }} | ||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 98: | Line 100: | ||
}} | }} | ||
{{ | {{Project background | ||
|Project started=2005/09/01 | |||
|Works started=2007/09/01 | |||
|Works completed=2008/04/01 | |||
|Total cost category=50 - 100 k€ | |||
|Project started= | |Total1 cost=76 | ||
|Funding sources=WWF, DOEN Foundation | |||
|Works started= | |Investigation and design cost category=10 - 50 k€ | ||
|Stakeholder1 engagement cost category=1 - 10 k€ | |||
|Works completed= | |Works1 and supervision cost category=1 - 10 k€ | ||
|Post-project1 management and maintenance cost category=Less than 1 k€ | |||
|Monitoring1 cost category=Less than 1 k€ | |||
|Total cost category= | |||
|Total1 cost= | |||
|Funding sources= | |||
|Investigation and design cost category= | |||
|Stakeholder1 engagement cost category= | |||
|Works1 and supervision cost category= | |||
|Post-project1 management and maintenance cost category= | |||
|Monitoring1 cost category= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 251: | Line 194: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.veliko-tarnovo.bg/bg/ | |||
|Description=Veliko Tarnovo municipality | |||
}} | |||
{{Additional links and references | |||
|Link=www.wwf.bg/ | |||
|Description=WWF-Bulgaria | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
Line 277: | Line 226: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 10:43, 6 September 2013
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Hydromorphology |
Country | Bulgaria |
Main contact forename | Ivan |
Main contact surname | Hristov |
Main contact user ID | |
Contact organisation | WWF Danube Carpathian programme Bulgaria |
Contact organisation web site | http://www.wwf.bg |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
WWF together with local people from Mindya village in the region of Veliko Turnovo, restored the connection of Veselina River, a tributary of Yantra, with its former meander near the village. When the river meander was cut off back in time, the river dug nearly 150 cm deeper into its bed, so now a threshold had to be built to raise its level enough for enabling it run back to its old bed.
The project objective is by conducting a number of technical, environmental and forest management activities to achieve ecosystem restoration of the river Vesselina in particular: • Conservation and restoration of biodiversity in isolated old bed of the river and correction of Vesselina river near by Mindya village; • Create favorable conditions for development of recreation and tourism in the region; • Reduce the level of flood risk; • Optimization of groundwater level and reduce the impact of drought and floods on agricultural land in river terrace; • Reduction of erosion; • Increased self-purification capacity of water flow in the region of isolated old bed of the river.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|