Case study:Reméandration du Geer à Grand-Axhe: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=50.6824438719542, 5.2252478602167685 }} {{Project overview |Project title=Reméandration du Geer à Grand-Ax...") |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 16: | Line 16: | ||
|Multi-site=No | |Multi-site=No | ||
}} | }} | ||
{{Case study subcatchment}} | {{Image gallery}} | ||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Meuse | |||
}} | |||
{{Site}} | {{Site}} | ||
{{Project background}} | {{Project background | ||
|Reach length directly affected=1000 | |||
|Project started=2009/09/30 | |||
|Works started=2012/04/11 | |||
|Works completed=2012/09/28 | |||
|Project completed=2012/12/31 | |||
|Total1 cost=225 | |||
|Funding sources=Interreg IV A Programme 2007-2013 50% Région Wallonne 50% | |||
|Invst and design cost=50 | |||
|Investigation and design Lead organisation=SAR Consult | |||
|stk engagement cost=1 | |||
|Stakeholder engagement Lead organisation=CRMA | |||
|Works and supervision Lead organisation=SAR Consult | |||
|Post-project management and maintenance Lead organisation=CRMA | |||
|Monitoring Lead organisation=CRMA | |||
}} | |||
{{Motivations}} | {{Motivations}} | ||
{{Measures}} | {{Measures}} | ||
Line 31: | Line 52: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 38: | Line 57: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 09:33, 6 September 2013
Location: 50° 40' 56.80" N, 5° 13' 30.89" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits, Water quality |
Country | Belgium |
Main contact forename | Mols |
Main contact surname | Julien |
Main contact user ID | |
Contact organisation | Contrat de Rivière Meuse Aval |
Contact organisation web site | http://www.meuseaval.be |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Aaijen- Removal of bank fixation, Meers - Floodplain lowering, Rijkelse Bemden - River bed widening, Voorste Nete at Dessel
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|