Case study:Kuuskoski-Fishway: Difference between revisions
No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
|Name of parent multi-site project=Case_study:Restoration of Koskenkylänjoki River | |Name of parent multi-site project=Case_study:Restoration of Koskenkylänjoki River | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Construction of Kuuskoski fishway was part of the Koskenkylänjoki River restoration project. In 20th century Koskenkylänjoki River was known for its sea trout population. Dams made it impossible for the migrants to rise up in the stream and population density of sea trout decreased radically. In 2008 the regional ELY-centre (environmental authority) launched a project during which a bypass for the migrants was built. The aim of the restoration was to promote the natural breeding of migratory whitefish, salmon and sea trout. | |Project summary=Construction of Kuuskoski fishway was part of the Koskenkylänjoki River restoration project. In 20th century Koskenkylänjoki River was known for its sea trout population. Dams made it impossible for the migrants to rise up in the stream and population density of sea trout decreased radically. In 2008 the regional ELY-centre (environmental authority) launched a project during which a bypass for the migrants was built. The aim of the restoration was to promote the natural breeding of migratory whitefish, salmon and sea trout. The project was managed by Centre for Economic Development, Transport and the Environment for Uusimaa (environmental authority) and financed by The European Fisheries Fund (EFF) and the state of Finland. | ||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 12:00, 21 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ymparisto.fi/default.asp?contentid=202755 |
Themes | Habitat and biodiversity |
Country | Finland |
Main contact forename | Pasi |
Main contact surname | Lempinen |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Construction of Kuuskoski fishway was part of the Koskenkylänjoki River restoration project. In 20th century Koskenkylänjoki River was known for its sea trout population. Dams made it impossible for the migrants to rise up in the stream and population density of sea trout decreased radically. In 2008 the regional ELY-centre (environmental authority) launched a project during which a bypass for the migrants was built. The aim of the restoration was to promote the natural breeding of migratory whitefish, salmon and sea trout. The project was managed by Centre for Economic Development, Transport and the Environment for Uusimaa (environmental authority) and financed by The European Fisheries Fund (EFF) and the state of Finland.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | |
---|---|
River basin | Koskenkylänjoki River BAsin |
Subcatchment
River name | Kuuskoski Torrent |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Kuuskoski Torrent |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 202 k€202,000 € <br /> |
Benefit to cost ratio | |
Funding sources | EU, State |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building fishway, Introducing gravel, Building of submerged weirs and pits, Introducing stones |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Awaiting results | |||||
Fish | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|