Case study:Diversion of the River Nith: Difference between revisions
Jump to navigation
Jump to search
Mattleeson (talk | contribs) No edit summary |
Mattleeson (talk | contribs) No edit summary |
||
Line 40: | Line 40: | ||
|Total1 cost=3900000 | |Total1 cost=3900000 | ||
|Funding sources=Developer (mining company) | |Funding sources=Developer (mining company) | ||
|Monitoring Lead organisation=University of Stirling | |||
}} | }} | ||
{{Motivations | {{Motivations |
Revision as of 11:20, 21 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 55° 23' 5.09" N, 4° 17' 26.27" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity |
Country | Scotland |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | User:NickRRC |
Contact organisation | River Restoration Centre |
Contact organisation web site | |
Partner organisations | East Ayrshire Council, SEPA, SNH, RSPB, Nith Salmon Fisheries Board, New Cumnock Angling Association, Halcrow, River Restoration Centre |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Scotland RBD |
---|---|
River basin | Solway |
Subcatchment
River name | Nith |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | 12301,230 km² <br />123,000 ha <br /> |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 500500 m <br />0.5 km <br />50,000 cm <br /> |
Dominant geology | |
Ecoregion | Great Britain |
Dominant land cover | |
Waterbody ID |
Site
Name | Nith, west of New Cumnock |
---|---|
WFD water body codes | 10612 |
WFD (national) typology | Mid, Small, Calcareous |
WFD water body name | River Nith (u/s New Cumnock) |
Pre-project morphology | |
Reference morphology | Retain hydromorphology and planform of former channel. |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Mixed gravel, pebble and boulder |
River corridor land use | Pasture and open-cast mining. |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 30003,000 m <br />3 km <br />300,000 cm <br /> |
---|---|
Project started | |
Works started | 2000/04/01 |
Works completed | 2000/09/01 |
Project completed | |
Total cost category | more than 10000 k€ |
Total cost (k€) | 39000003,900,000 k€ <br />3,900,000,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Developer (mining company) |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring | University of Stirling |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information