Case study:Rehabilitation of Benta stream: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
Line 8: | Line 8: | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=47.318749069466136, 18.93682407409665 | ||
}} | }} | ||
{{Project_overview | {{Project_overview |
Revision as of 16:44, 17 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 47° 19' 7.50" N, 18° 56' 12.57" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | Hungary |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | Middle-Danube-Valley Water Management Directorate |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Benta stream |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | 410 km²41,000 ha <br /> |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Hungarian Lowlands |
Dominant land cover | Urban, Woodland |
Waterbody ID |
Site
Name | Benta stream |
---|---|
WFD water body codes | AEP318 |
WFD (national) typology | 18 |
WFD water body name | |
Pre-project morphology | Single channel, Straight, Revetments |
Reference morphology | Single channel, Sinuous |
Desired post project morphology | |
Heavily modified water body | false |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Permanent lotic |
Dominant substrate | Gravel |
River corridor land use | Urban, Industry, Intensive agriculture |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2008/08/01 |
Works started | 2009/06/01 |
Works completed | 2011/05/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 2463 k€2,463,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Operational Program of New Hungary Development Plan, EU funded |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Middle-Danube-Valley Water Management Directorate | ||||
Stakeholder engagement and communication | Middle-Danube-Valley Water Management Directorate | ||||
Works and works supervision | Middle-Danube-Valley Water Management Directorate | ||||
Post-project management and maintenance | Middle-Danube-Valley Water Management Directorate | ||||
Monitoring | Middle-Danube-Valley Water Management Directorate |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Renewal of reventments, Removal of sediment, Planting, Creation of fish spawn nursing places, Creation of piplines |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | Reparation of sluice gates |
Non-structural measures
| |
Management interventions | channel maintenance |
Social measures (incl. engagement) | Floodprotection, landenhancement |
Other | Information provision |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Quantity & dynamics of flow | Yes | Yes | Improvement | |||
Structure & condition of riparian zones | Yes | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|