File:Jan 2009 Opening meanders.JPG: Difference between revisions
Jump to navigation
Jump to search
(January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow) |
(No difference)
|
Latest revision as of 10:26, 8 July 2013
January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow sediments to settle and reduce the potential for dirty water to pass downstream before the upstream was slowly opened. ©AECOM
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 10:26, 8 July 2013 | 1,439 × 1,080 (359 KB) | NickRRC (talk | contribs) | January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow |
You cannot overwrite this file.
File usage
The following page uses this file: