Uploads by AnaStržen

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
Date Name Thumbnail Size Description Versions
12:32, 22 August 2018 LIFE Strzen project area.jpg (file) 1.57 MB   2
13:00, 18 April 2023 Truck arrival.jpg (file) 2.35 MB Arrival of mechanisation at the entry to the lake area 1
13:02, 18 April 2023 Digging mechanisation.jpg (file) 2.38 MB   1
12:22, 15 May 2023 Access road preparation.jpg (file) 3.35 MB Preparation of access road to the construction area. 1
06:41, 17 May 2023 Finished road.jpg (file) 719 KB Due to the wet terrain we had to strenghten the access road with gravel. 1
07:49, 17 May 2023 Flooded road in 2020.jpg (file) 3.17 MB In 2020, works could not continue, due to high water levels - the lake did not fully disappear over summer. 1
07:54, 17 May 2023 2020 Flooded road.jpg (file) 3.17 MB In 2020, unfortunately the works could not continue due to high water levels. 1
13:25, 17 May 2023 Channel crossing.jpg (file) 8.14 MB Making a new access road over the straight channel. 1
11:11, 24 May 2023 Filling-in of the-channel.jpg (file) 1.97 MB After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back. 1
11:17, 24 May 2023 Channel filling.jpg (file) 1.97 MB After rescuing as much fish and crustaceans as possible, the construction crew started filling in the channel with soil they had dug out two years back. 1
12:08, 24 May 2023 Filled-in-channel.jpg (file) 889 KB Part of the channel is finally filled up with soil. 1
12:25, 24 May 2023 Water draining.jpg (file) 2.24 MB Before we could start filling in the straight channel, we had to rescue any fish and crustaceans and pump out as much water as possible, so the soil wouldn't turn to mud. 1
12:37, 24 May 2023 Process of filling in the straight channel.jpg (file) 804 KB The straight channel was being filled in from both sides with excavators. 1
07:54, 25 May 2023 Channel-filling2.jpg (file) 2.44 MB Progress in filling in the now-dry straight channel. 1
08:06, 25 May 2023 First layer of soil is in.jpg (file) 1.57 MB Soil was being brought to the channel by a tractor with a dump trailer. 1
11:29, 25 May 2023 Finishing touches.jpg (file) 2.31 MB The final part of the lower part of the channel is being filled in - this was the trickiest part, since it was very muddy. 1
11:50, 25 May 2023 Strenghtening the channel barrier.jpg (file) 1.67 MB In total, we had to build three new barriers between the channel and the double meander to ensure the integrity of the new riverbed. 1