File:Borselva after restoration measures.tif: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 January 2020

  • curprev 12:4612:46, 13 January 2020NIVA DK talk contribs 164 bytes +164 A newly opened section of Børselva, including sedimentation pond (far left) and consecutive constructed wetlands. Source: Aanes et al 2016 (NIVA report 6900-2015).