  • curprev 08:1908:19, 12 March 2020KarCie talk contribs 612 bytes +612 Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged...